Public Institution Faculty of Philosophy, University of Zenica

PUBLIC INSTITUTION FACULTY OF PHILOSOPHY, UNIVERSITY OF ZENICA

Address: Zmaja od Bosne 56, Zenica

Heated area: 2,680 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of part of the existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Hydraulic balancing of the heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 647,090.39
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 54,282.63
Total energy savings (thermal and electrical): 344,397 kWh/year
CO2 emissions: 124 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Public InstitutionFaculty of Metallurgy and Technology Zenica

PUBLIC INSTITUTION “FACULTY OF METALLURGY AND TECHNOLOGY, UNIVERSITY OF ZENICA”

Address: Travnička cesta, Zenica

Heated area: 5,819.49 m2


Energy efficiency measures:

  • Thermal insulation facade walls;
  • Replacement of part of the existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,228,476.44
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 101,730
Total energy savings (thermal and electrical): 639,213 kWh/year
CO2 emissions: 171 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Public InstitutionFaculty of Mechanical Engineering, University of Zenica

PUBLIC INSTITUTION FACULTY OF MECHANICAL ENGINEERING, UNIVERSITY OF ZENICA

Address: Fakultetska 3, Zenica

Heated area: 6,216.22 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the roof;
  • Installation of automatic regulation of the heating system;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,082,757.64
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 82,910
Total energy savings (thermal and electrical): 525,377 kWh/year
CO2 emissions: 277 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Elementary School “Kulin ban” Visoko

ELEMENTARY SCHOOL “KULIN BAN” VISOKO

Address: Gornje Rosulje 1, Visoko

Heated area: 3,007.74 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of part of the existing joinery/metalwork and replacement of glazing;
  • Improvement of the central heating system;
  • Installation of gas boilers;
  • Installation of dynamic thermostatic valves;
  • Installation of piping and new radiators;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 640,828.53
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 76,196.11
Total energy savings (thermal and electrical): 386,854 kWh/year
CO2 emissions: 185 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022

Public Institution Elementary School “Skender Kulenović”, Zenica

PUBLIC INSTITUTION ELEMENTARY SCHOOL “SKENDER KULENOVIĆ”, ZENICA

Address: Radakovo, Zenica

Heated area: 3,460.62 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Installation of automatic regulation of the heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 462,843.05
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 55,525.24
Total energy savings (thermal and electrical): 307,851 kWh/year
CO2 emissions: 76 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Elementary School “MUSTAFA MULIĆ”, ŠIJE, MATUZIĆI

ELEMENTARY SCHOOL “MUSTAFA MULIĆ”, ŠIJE, MATUZIĆI

Address: Šije, Matuzići

Heated area: 950 m2


Energy efficiency measures:

  • Thermal insulation of fasade walls;
  • Thermal insulation of the ceiling;
  • Replacement of existing joinery/metalwork;
  • Partial replacement of lighting fixtures;
  • Improvement of the central heating system;
  • Installation of pellet boilers;
  • Installation of dynamic thermostatic valves;
  • Replacement of asbestos cover;

Total investments (BAM with VAT): 349,401.50
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 13,443.80
Total energy savings (thermal and electrical): 168,049 kWh/year
CO2 emissions: 130 tCO2 /year
Start of works: 21/09/2021
Works completed/Date of technical acceptance: 20/04/2022

Elementary School “Mak Dizdar” Zenica

ELEMENTARY SCHOOL MAK DIZDAR ZENICA

Address: Ćurkovića put 17, Zenica

Heated area: 5,375 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Installation of thermal energy meters;
  • Hydraulic balancing of the heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,078.686.02
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 81,268.85
Total energy savings (thermal and electrical): 572.454  kWh/year
CO2 emissions: 300 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Elementary School “Mula Mustafa Bešeskija” Visoko

ELEMENTARY SCHOOL MULA MUSTAFA BEŠESKIJA, VISOKO

Address: Donje Moštre, Visoko

Heated area: 2,378 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Thermal insulation and replacement of the cover of the sports hall;
  • Replacement of part of the existing joinery/metalwork;
  • Partial replacement of lighting fixtures;
  • Installation of dynamic thermostatic valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 449,503.81
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 25,886
Total energy savings (thermal and electrical): 442.562 kWh/year
CO2 emissions: 158 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022