About project
ELEMENTARY SCHOOL MAK DIZDAR ZENICA
Address: Ćurkovića put 17, Zenica
Heated area: 5,375 m2
Energy efficiency measures:
- Thermal insulation of facade walls;
- Replacement of existing joinery/metalwork;
- Installation of dynamic thermostatic valves;
- Installation of thermal energy meters;
- Hydraulic balancing of the heating system;
- Partial replacement of lighting fixtures;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 1,078.686.02
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 81,268.85
Total energy savings (thermal and electrical): 572.454 kWh/year
CO2 emissions: 300 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022