About project
ELEMENTARY SCHOOL “KULIN BAN” VISOKO
Address: Gornje Rosulje 1, Visoko
Heated area: 3,007.74 m2
Energy efficiency measures:
- Thermal insulation of facade walls;
- Thermal insulation of the ceiling;
- Replacement of part of the existing joinery/metalwork and replacement of glazing;
- Improvement of the central heating system;
- Installation of gas boilers;
- Installation of dynamic thermostatic valves;
- Installation of piping and new radiators;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 640,828.53
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 76,196.11
Total energy savings (thermal and electrical): 386,854 kWh/year
CO2 emissions: 185 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022