About project
ELEMENTARY SCHOOL “MUSTAFA MULIĆ”, ŠIJE, MATUZIĆI
Address: Šije, Matuzići
Heated area: 950 m2
Energy efficiency measures:
- Thermal insulation of fasade walls;
- Thermal insulation of the ceiling;
- Replacement of existing joinery/metalwork;
- Partial replacement of lighting fixtures;
- Improvement of the central heating system;
- Installation of pellet boilers;
- Installation of dynamic thermostatic valves;
- Replacement of asbestos cover;
Total investments (BAM with VAT): 349,401.50
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 13,443.80
Total energy savings (thermal and electrical): 168,049 kWh/year
CO2 emissions: 130 tCO2 /year
Start of works: 21/09/2021
Works completed/Date of technical acceptance: 20/04/2022