Federal Ministry of Finance

FEDERAL MINISTRY OF FINANCE

Address: Mehmeda Spahe 5, 71000 Sarajevo

Heated area: 3,155 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 465,018.37
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,167
Total energy savings (thermal and electrical): 393,528.00 kWh/year
CO2 emissions: 50 tCO2 /year
Works completed: 07/2018

Police Academy – Building A

POLICE ACADEMY – BUILDING A

Address: Dobojska 32, 71000 Sarajevo

Heated area: 1,260 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 201,463.31
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 13,734
Total energy savings (thermal and electrical): 113,865.00 kWh/year
CO2 emissions: 19 tCO2 /year
Works completed: 03/2018

Elementary school April 15, Kakanj

ELEMENTARY SCHOOL APRIL 15, KAKANJ

Address: 29. Novembar 35, Kakanj

Heated area: 2,120 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Thermal insulation of the part of the attic space;
  • Replacement of facade openings;
  • Rehabilitation of the existing part of the cover – replacement of salonite panels with a steel sheet cover;
  • Installation of radiators in the hall;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption and;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 298,414.64
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,211
Total energy savings (thermal and electrical): 280,237.00 kWh/year
CO2 emissions: 66 tCO2 /year
Works completed: 04/2018

Gymnasium Rizah Odžečkić

GYMNASIUM RIZAH ODŽEČKIĆ

Address: Stjepana Radića 43, Zavidovići

Heated area: 1,467 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade; 
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of motion and daylight sensors;
  • Installation of dynamic thermostatic radiator valves;
  • Replacement of energy source;
  • Installation of equipment for measuring energy consumption and monitoring temperature and humidity;
  • Installation of new pellet boilers;
  • Installation of equipment for measuring energy consumption and;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 327,266.31
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 42,099
Total energy savings (thermal and electrical): 128,098.00 kWh/year
CO2 emissions: 32 tCO2 /year
Works completed: 04/2018

Elementary school March 21

ELEMENTARY SCHOOL MARCH 21

Address: Trg 21. mart 12, Matuzići, Doboj Jug

Heated area: 1,953 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Repair of part of the roof;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of motion sensors;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Installation of the new pellet boiler;

Total investments (BAM with VAT): 141,182.75
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 14,307
Total energy savings (thermal and electrical):  135,151.00 kWh/year
CO2 emissions: 28 tCO2 /year
Works completed: 04/2018

Public Institution Elementary school „Isak Samokovlija“

PUBLIC INSTITUTION ELEMENTARY SCHOOL ISAK SAMOKOVLIJA

Address: Fra Anđela Zvizdovića 1, 71 000 Sarajevo

Heated area: 2,383m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the roof;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 601,044.05
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 162,743
Total energy savings (thermal and electrical): 180,659.00 kWh/year
CO2 emissions: 56 tCO2 /year
Works completed: 03/2018

Ivan Fra Frane Jukića Elementary School

IVAN FRA FRANE JUKIĆA ELEMENTARY SCHOOL

Address: Sivša bb, Usora

Heated area: 488 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling towards the attic;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of the new pellet boiler;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 86,483.84
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 4,899
Total energy savings (thermal and electrical): 14,517.00 kWh/year
CO2 emissions: 21 tCO2 /year
Works completed: 04/2018

Clinic for Neurology and Psychiatry, Clinical Centre of the University of Sarajevo

CLINIC FOR NEUROLOGY AND PSYCHIATRY, CLINICAL CENTRE OF THE UNIVERSITY OF SARAJEVO

Adress: Bolnička 25, 71000 Sarajevo

Heated area: 5,704 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Thermal insulation of the mezzanine structures above the unheated basement;
  • Renovation of part of the roof covering and flat roof terraces in the central part of the building;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of circulation pumps;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity;
  • Improvement of the central heating system

Total investments (BAM): 1,163,028.18
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 183,164
Total energy savings (thermal and electrical): 781,669.00 kWh/year
CO2 emissions: 226 tCO2 /year
Works completed: 06/2018

Cantonal Hospital “Fra Mihovil Sučić”

CANTONAL HOSPITAL FRA MIHOVIL SUČIĆ

Address: Svetog Ive 2, Livno

Heated area: 5,530 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Partial restoration of the roof;
  • Installation of a system of solar collectors for PTV;
  • Thermal insulation of internal walls towards unheated space;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Improvement of the reactive component electricity consumption system, i.e. installation of the electrical energy compensation circuit;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 496,308.17 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 81,746
Total energy savings (thermal and electrical): 556,569.00 kWh/year
CO2 emissions: 30 tCO2 /year
Works completed: 03/2018

Health Centre Tomislavgrad

HEALTH CENTRE TOMISLAVGRAD

Address: Mije Ferića bb, Tomislavgrad

Heated area: 4,921 m2


Energy efficiency measures:

 

  • Thermal insulation of façade
  • Replacement of existing joinery and/or hardware
  • Ceiling insulation
  • Replacement of existing incandescent bulbs with energy-saving light bulbs
  • Installation of two pellet boilers
  • Installation of equipment for measuring energy consumption and for monitoring temperature and humidity

Total investments (BAM with VAT): 357,545.25 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 45,393 
Total energy savings (thermal and electrical): 543,789 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 04/2018