Public Institution Sixth Elementary School Mostar

PUBLIC INSTITUTION SIXTH ELEMENTARY SCHOOL MOSTAR

Address: Alekse Šantića 10, 88 000 Mostar

Heated area: 2,269 m2


Energy efficiency measures:

 

  • Partial replacement of existing joinery
  • Thermal insulation of façade
  • Thermal insulation of ceiling construction and flat roofs
  • Replacement of the sports hall cover
  • Installation of thermostatic valves
  • Replacement of boiler and energy source

Total investments (BAM with VAT): 375,247.28 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 39,485 
Total energy savings (thermal and electrical): 110,354.00 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 5/2019

Public Institution Drežnica, Elementary School

PUBLIC INSTITUTION DREŽNICA ELEMENTARY SCHOOL

Address: Donja Drežnica bb, Mostar

Heated area: 1,768 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Renovation of part of the roof covering with all necessary layers;
  • Installation of thermostatic valves on radiators;
  • Rehabilitation of the radiator heating of the sports hall;
  • Partial replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 440,403.75 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 6,698
Total energy savings (thermal and electrical):141.840,00 kWh/year
CO2 emissions: 2 tCO2 /year
Works completed: 6/2018

Secondary school Jablanica

SECONDARY SCHOOL JABLANICA

Address: Zlatnih ljiljana br.4, Jablanica

Area: 2,011 m2


Energy efficiency measures:



  • Thermal insulation of facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Renovation of the roof structure and replacement of the roof covering;
  • Partial replacement of lighting fixtures with more energy efficient; ones;
  • Replacement of energy source;
  • Installation of the new pellet boiler;
  • Adaptation of the existing boiler room for new needs;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Improvement of the central heating system;

Total investments (BAM with VAT): 488,456.20 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 24,379 
Total energy savings (thermal and electrical): 118,955.00 kWh/year
CO2 emissions: 50 tCO2/year
Works completed: 7/2018

Public Institution Elementary school Cardinal Stepinac

PUBLIC INSTITUTION ELEMENTARY SCHOOL CARDINAL STEPINAC

Address: Stjepana Radića bb, Neum

Heated area: 1,484 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Thermal insulation of the roof along the slope of the roof plane between the rafters – mineral wool; 

Total investments (BAM with VAT): 211,683.38 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 30,383 
Total energy savings (thermal and electrical): 181,666.00 kWh/year
CO2 emissions: 60 tCO2/year
Works completed: 7/2018

Elementary school Silvije Strahimir Kranjčević

ELEMENTARY SCHOOL SILVIJE STRAHIMIR KRANJČEVIĆ

Address: Bleiburških žrtava 35, Mostar

Area: 6,400 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade (school + sports hall);
  • Replacement of facade openings (school + sports hall);
  • Thermal insulation of flat and sloping roofs;
  • Replacement of the existing cover of the sports hall with thermal panels;
  • Replacement of energy source;
  • Installation of the new pellet boiler;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Rehabilitation of the boiler room;

Total investments (BAM with VAT): 1,092,522.77 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 122,936 
Total energy savings (thermal and electrical): 181,666.00 kWh/year
CO2 emissions: 163 tCO2 /year
Works completed: 7/2018

Elementary School Vareš Majdan

ELEMENTARY SCHOOL VAREŠ MAJDAN

Address: Perunska 24, 71330 Vareš

Heated area: 3,049 m2


Energy efficiency measures:

 

 

  • Thermal insulation of the facade (school + sports hall);
  • Replacement of facade openings (school + sports hall);
  • Thermal insulation of the ceiling towards the attic (school);
  • Rehabilitation and thermal insulation of the pitched roof of the changing rooms and sports hall;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Renovation of the roof of the school and the gymnasium;
  • Replacement of worn-out asbestos cement roof panels panels with the new cover made of a steel sheet and thermopanel;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 533,970.47
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 26,523
Total energy savings (thermal and electrical): 416.712,00 kWh/year
CO2 emissions: 23 tCO2 /year
Works completed: 04/2018

Prison Igman

PRISON IGMAN

Address: Branilaca Sarajeva 8, Sarajevo

Heated area: 498 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of new pellet boilers;
  • Automatic regulation for the heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 159,361.27
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 23,860
Total energy savings (thermal and electrical): 129.050,00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 03/2018

Public Institution Pazarić Institute – Pavilion 8

PUBLIC INSTITUTION PAZARIĆ INSTITUTE – PAVILION 8

Address: Pazarić Resnik, 71243 Pazarić

Heated area: 1,317 m2


Energy efficiency measures:

 

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 212,276.55
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 10,029
Total energy savings (thermal and electrical): 128,190.00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary fuel for heating)
Works completed: 03/2018

Elementary School Gazi Ferhad-Beg Jablanica

ELEMENTARY SCHOOL GAZI FERHAD-BEG JABLANICA

Address: Jablanica bb, Tešanj

Heated area: 1,330 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Repair of the roof and thermal insulation of the attic;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of the new pellet boiler;
  • Installation of heat accumulators;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity

Total investments (BAM with VAT): 284,841.08
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 9,744
Total energy savings (thermal and electrical): 393,362.00 kWh/year
CO2 emissions: 99 tCO2 /year
Works completed: 12/2017

Prison Bihać

PRISON BIHAĆ

Address: Rasima Delića bb 77000 Bihać

Heated area: 1,098 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of a new pellet boiler;
  • Connection of the administrative building to the new boiler room;
  • Installation of external LED reflectors;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 284,128.26
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 45,962
Total energy savings (thermal and electrical): 162.714,00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the energy renovation, the energy source was replaced with biomass)
Works completed: 03/2018