Secondary School Čapljina

Secondary School Čapljina

Address: Ruđera Boškovića 9, Čapljina

Heated area: 4,770 m2


Energy efficiency measures:

  • Thermal insulation of the facade;
  • Reconstruction of the roof and thermal insulation of the ceiling;
  • Replacement of facade openings;
  • Installation of the new pellet boiler;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 996,062.76 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM):  166,231
Total energy savings (thermal and electrical): 705,600.00 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 12/2016

Secondary School Konjic

SECONDARY SCHOOL KONJIC

Address: Maršala Tita 80, Konjic

Heated area: 5,115 m2

Energy efficiency measures:

 

  • Thermal insulation of the facade
  • Repairs and thermal insulation of passable and non-passable roofs
  • Replacement of facade openings
  • Installation of dynamic thermostatic radiator valves
  • Installation of the new pellet boiler
  • Installation of equipment for measuring energy consumption
  • Installation of temperature and humidity monitoring equipment

Total investments (BAM with VAT): 843,904.20 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 167,529 BAM
Total energy savings (thermal and electrical): 499.767,00 kWh/year
CO2 emissions: 233 tCO2 /year
Works completed: 1/2017

Public Institution Fourth Elementary School Mostar

PUBLIC INSTITUTION FOURTH ELEMENTARY SCHOOL MOSTAR

Address: Salke Šestića 23, Mostar

Area: 4,230 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Rehabilitation and thermal insulation of flat and sloping roofs;
  • Replacement of facade openings;
  • Installation of the new pellet boiler;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 761,531.60 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 99,757
Total energy savings (thermal and electrical): 323,097.00 kWh/year
CO2 emissions: 111 tCO2 /year
Works completed: 12/2016

Fra Didak Buntić Elementary School

FRA DIDAK BUNTIĆ ELEMENTARY SCHOOL

Address: Kralja Tomislava 94, Čitluk

Area: 3,255 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling of the building;
  • Replacement of facade openings;
  • Installation of the new pellet boiler;
  • Installation of dynamic thermostatic radiator valves;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;


Total investments (BAM with VAT): 474,330.57 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 29,425
Total energy savings (thermal and electrical): 255.005,00 kWh/year
CO2 emissions: 96 tCO2 /year
Works completed: 12/2016

Health Centre Jablanica

Health Centre Jablanica

Address: Sulje Čilića 15, Jablanica

Heated area: 1,800 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Thermal insulation of the attic space;
  • Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves Installation of the new pellet boiler;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 288,869.51 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 91,604 
Total energy savings (thermal and electrical): 293,313.00 kWh/year
CO2 emissions: 94 tCO2 /year
Works completed: 1/2017

Secondary School of Civil Engineering Juraj Dalmatinac

SECONDARY SCHOOL OF CIVIL ENGINEERING JURAJ DALMATINAC

Address: Kralja Zvonimira 24, Mostar

Heated area: 1,800 m2


Energy efficiency measures:


  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling above the unheated basement;
  • Rehabilitation and thermal insulation of the flat roof Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of the new pellet boilers;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;


Total investments (BAM with VAT): 565,845.87
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 63,371
Total energy savings (thermal and electrical): 152,135 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 12/2016

 

Psychiatric Clinic of the University Clinical Hospital

PSYCHIATRIC CLINIC OF THE UNIVERSITY CLINICAL HOSPITAL

Address: Kneza Mihajla Viševića Humskog 39, Mostar

Area: 4,256 m2


Energy efficiency measures:

 
  • Thermal insulation of facade and the roof
  • Replacement of facade openings
  • Installation of equipment for measuring energy consumption
  • Installation of temperature and humidity monitoring equipment

Total investments (BAM with VAT): 809,352.62
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 102,470
Total energy savings (thermal and electrical): 503,455.00 kWh/year
CO2 emissions: 147 tCO2/year
Works completed: 06/2016

Elementary School Crnići

ELEMENTARY SCHOOL CRNIĆI

Address: Crnići bb, Stolac

Heated area: 704 m2


Energy efficiency measures:

 
  • Thermal insulation of the ceiling under the roof;
  • Thermal insulation of the facade;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of new radiators;
  • Installation of the new pellet boiler;

Total investments (BAM with VAT): 254,538.79 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 3,834 
Total energy savings (thermal and electrical): 49,078.00 kWh/year
CO2 emissions: 3 tCO2 /year
Works completed: 12/2016

Clinical Centre of the University of Sarajevo – Clinic for orthopedics and traumatology

CLINICAL CENTRE OF THE UNIVERSITY OF SARAJEVO – CLINIC FOR ORTHOPEDICS AND TRAUMATOLOGY

Address: Bolnička 25, Sarajevo

Heated area: 7,382 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,257.394,21 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 110,075 
Total energy savings (thermal and electrical): 781,669.00 kWh/year
CO2 emissions: 167 tCO2 /year
Works completed: 07/2016

Public Institution Elementary School Zahid Baručija

PUBLIC INSTITUTION ELEMENTARY SCHOOL ZAHID BARUČIJA

Address: Omladinska 14, Sarajevo

Heated area: 1,782 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Reconstruction and thermal insulation of the flat roof;
  • Replacement of facade openings;
  • Installation of daylight sensors;
  • Cleaning of heating elements in the gymnasium;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 267,573.47 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 28,725 
Total energy savings (thermal and electrical): 168,646.00  kWh/year
CO2 emissions: 65 tCO2 /year
Works completed: 11/2016