Public Institution Secondary School of Electrical Engineering, Sarajevo

PUBLIC INSTITUTION SECONDARY SCHOOL OF ELECTRICAL ENGINEERING, SARAJEVO

Address: Safeta Zajke 2, 71 000 Sarajevo

Heated area: 4,495 m2


Energy efficiency measures:

 
  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Installation of new gas boilers;
  • Rehabilitation of the boiler room;

Total investments (BAM with VAT): 547,953.48
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 35,254
Total energy savings (thermal and electrical): 327,137.00 kWh/year
CO2 emissions: 91 tCO2 /year
Works completed: 07/2019

Public Institution Fifth Elementary School, Ilidža

PUBLIC INSTITUTION FIFTH ELEMENTARY SCHOOL, ILIDŽA

Address: Umihane Čuvidine 58, Sokolovići – Ilidža

Heated area: 2,887 m2


Energy efficiency measures:

 
  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of new gas boilers;
  • Installation of dynamic thermostatic radiator valves

Total investments (BAM with VAT): 372,313.42
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 18,636
Total energy savings (thermal and electrical):  246,930.00 kWh/year
CO2 emissions: 187 tCO2 /year
Works completed: 07/2019

Public Institution Elementary School Izet Šabić, Vogošća

PUBLIC INSTITUTION ELEMENTARY SCHOOL IZET SABIC, VOGOSCA

Address: Donji Hotonj, bb 71 320 Vogošća

Heated area: 2,531 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of circulation pumps;
  • Replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 338,799.66
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 48,206
Total energy savings (thermal and electrical): 241,158.00  kWh/year
CO2 emissions: 105 tCO2 /year
Works completed: 07/2019

Elementary School Vladimir Nazor

ELEMENTARY SCHOOL VLADIMIR NAZOR

Address: Sarajevska 20, Zenica

Heated area: 2,557 m2


Energy efficiency measures:

 
  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling;
  • Installation of dynamic thermostatic radiator valves;
  • Partial replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 642,530.85
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 73,038
Total energy savings (thermal and electrical): 457,150.00 kWh/year
CO2 emissions: 158 tCO2 /year
Works completed: 05/2019

Public Institution Gymnasium Visoko

PUBLIC INSTITUTION GYMNASIUM, VISOKO

Address: Musala 23, 71 300 Visoko

Heated area: 1,858 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Thermal insulation of ceilings;
  • Renovation of the flat roof;

Total investments (BAM with VAT): 126,144.05
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 9,936
Total energy savings (thermal and electrical): 18.076,00 kWh/year
CO2 emissions: 25 tCO2 /year
Works completed: 05/2019

Public Institution Second Elementary School Zavidovići

PUBLIC INSTITUTION SECOND ELEMENTARY SCHOOL ZAVIDOVIĆI

Address: 8.Mart, 72 220 Zavidovići

Heated area: 2,726 m2


Energy efficiency measures:

 

  • Thermal insulation of the ceiling;
  • Installation of new pellet boilers;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of dynamic thermostatic radiator valves;

Total investments (BAM with VAT): 284,254.08
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 31,710
Total energy savings (thermal and electrical): 53,954.00  kWh/year
CO2 emissions: 86 tCO2 /year
Works completed: 05/2019

Combined Secondary School Stjepan Radić, Usora

COMBINED SECONDARY SCHOOL STJEPAN RADIĆ, USORA

Address: Žabljak bb, Usora

Heated area: 2,162 m2


Energy efficiency measures:

 

  • Replacement of boiler plant;
  • Replacement of the part of the pipeline distribution system and radiator bodies (331 articles);
  • Installation of daylight and movement sensors on the lighting system;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 82,712.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 14,532
Total energy savings (thermal and electrical): 20,596.00 kWh/year
CO2 emissions: 34 tCO2 /year
Works completed: 05/2019

Public Institution Secondary School Gymnasium Muhsin Rizvić

PUBLIC INSTITUTION SECONDARY SCHOOL GYMNASIUM MUHSIN RIZVIC

Address: Ulica šehida 32, 72 240 Kakanj

Heated area: 2,240 m2


Heated area: 2,240 m2

 

  • Thermal insulation of the ceiling;
  • Replacement of facade openings;
  • Partial thermal insulation of the facade and production of the final facade layer;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 143,885.87
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 32,190
Total energy savings (thermal and electrical): 104,920.14 kWh/year
CO2 emissions: 27 tCO2 /year
Works completed: 05/2019

Public Institution Elementary School “Antun Branko Šimić”

PUBLIC INSTITUTION ELEMENTARY SCHOOL ANTUN BRANKO ŠIMIĆ

Address:  Kraljice Katarine 38, 88 000 Mostar

Heated area: 3,585 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling above the unheated basement;
  • Thermal insulation of the envelope of the flat roof with additional thermal insulation;
  • Thermal insulation of the ceiling with additional thermal insulation;
  • Renovation of the roof structure and replacement of the roof covering;
  • Replacement of facade openings;
  • Improvement of the electricity consumption system;
  • Improvement of the central heating system;

Total investments (BAM with VAT): 792,865.39 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 57,607 
Total energy savings (thermal and electrical): 603,825.00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 5/2019

Public Institution Elementary School Ivan Gandulić Mostar

PUBLIC INSTITUTION ELEMENTARY SCHOOL IVAN GUNDULIĆ MOSTAR

Address: Rudarska 87, 88 000 Mostar

Heated area: 1,980 m2


Energy efficiency measures:

 

  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Thermal insulation of the flat roof;
  • Installation of the new pellet boiler;
  • Installation of dynamic thermostatic radiator valves;
  • Replacement of circulation pumps;

Total investments (BAM with VAT): 466,830 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,941 
Total energy savings (thermal and electrical): 125,994.00 kWh/year
CO2 emissions: 66 tCO2 /year
Works completed: 5/2019