Elementary School “Mak Dizdar” Zenica

ELEMENTARY SCHOOL MAK DIZDAR ZENICA

Address: Ćurkovića put 17, Zenica

Heated area: 5,375 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Installation of thermal energy meters;
  • Hydraulic balancing of the heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,078.686.02
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 81,268.85
Total energy savings (thermal and electrical): 572.454  kWh/year
CO2 emissions: 300 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Elementary School “Mula Mustafa Bešeskija” Visoko

ELEMENTARY SCHOOL MULA MUSTAFA BEŠESKIJA, VISOKO

Address: Donje Moštre, Visoko

Heated area: 2,378 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Thermal insulation and replacement of the cover of the sports hall;
  • Replacement of part of the existing joinery/metalwork;
  • Partial replacement of lighting fixtures;
  • Installation of dynamic thermostatic valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 449,503.81
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 25,886
Total energy savings (thermal and electrical): 442.562 kWh/year
CO2 emissions: 158 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022

Public Institution Elementary School “Rešad Kadić” Kakanj

PUBLIC INSTITUTION ELEMENTARY SCHOOL REŠAD KADIĆ KAKANJ

Address: Gradac br. 240, Brnjic, Kakanj

Heated area: 1,626.90 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing carpentry and/or locksmithing;
  • Thermal insulation of the ceiling above the heated space;
  • Thermal insulation of the roof;
  • Replacement of asbestos cover;
  • Installation of thermal energy meters;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 238,940.36
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 9,120
Total energy savings (thermal and electrical): 251,555 kWh/year
CO2 emissions: 78 tCO2 /year
Start of works: 27/09/2021
Works completed/Date of technical acceptance: 21/03/2022

Public Institution Elementary School “Kulin ban” Tešanjka

PUBLIC INSTITUTION ELEMENTARY SCHOOL KULIN BAN TEŠANJKA

Address: Trg žrtava osmog oktobra, Tešanjka

Heated area: 1,633.50 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of existing joinery/metalwork;
  • Replacement of asbestos cover;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 316,997.60
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 21,550
Total energy savings (thermal and electrical): 381.050 kWh/year
CO2 emissions: 0 tCO2 /year
Start of works: 21/09/2021
Works completed/Date of technical acceptance: 20/04/2022

Public Institution Combined Secondary School Zenica

PUBLIC INSTITUTION COMBINED SECONDARY SCHOOL ZENICA

Address: Dr. Adolfa Goldberga 10, Zenica

Heated area: 3,967.32 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of existing joinery/metalwork;
  • Improvement of the central heating system;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of 12 solar panels;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 801,265.92
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 108,885.78
Total energy savings (thermal and electrical): 671,915 kWh/year
CO2 emissions: 165 tCO2 /year
Start of works: 27/09/2021
Works completed/Date of technical acceptance: 21/03/2022

Elementary School Vareš

ELEMENTARY SCHOOL VAREŠ

Address: Put mira br. 37, Vareš

Heated area: 2,849 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Thermal insulation and replacement of the cover of the sports hall;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 290,515.60
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 8,339
Total energy savings (thermal and electrical): 262,760 kWh/year
CO2 emissions: 90 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022

Elementary School “Novi Šeher”, Novi Šeher, Maglaj

ELEMENTARY SCHOOL “NOVI ŠEHER”, NOVI ŠEHER, MAGLAJ

Address: Novi Šeher, Maglaj

Heated area: 1,082 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of existing joinery/metalwork;
  • Partial replacement of lighting fixtures;
  • Installation of dynamic thermostatic valves;

Total investments (BAM with VAT): 221,318.79
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 27,832
Total energy savings (thermal and electrical):  103,386 kWh/year
CO2 emissions: 29 tCO2 /year
Start of works: 21/09/2021
Works completed/Date of technical acceptance: 20/04/2022

Elementary School “Safvet-beg Bašagić” Breza

ELEMENTARY SCHOOL SAFVET-BEG BAŠAGIĆ BREZA

Address: Breza

Heated area: 2,260 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of existing joinery/metalwork;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 496,273.14
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 19,880.13
Total energy savings (thermal and electrical): 71.729 kWh/year
CO2 emissions: 20 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022

Public Institution Combined Secondary Vocational School Kakanj

PUBLIC INSTITUTION COMBINED SECONDARY VOCATIONAL SCHOOL KAKANJ

Šehida, Kakanj

Heated area: 2,659.16 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Installation of pellet boilers;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 453,408.08
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 59,489.71
Total energy savings (thermal and electrical): 773,913 kWh/year
CO2 emissions: 280 tCO2 /year
Start of works: 27/09/2021
Works completed/Date of technical acceptance: 21/03/2022

Elementary school “Safvet-beg Bašagić” Visoko

ELEMENTARY SCHOOL “SAFVET-BEG BAŠAGIĆ” VISOKO

Donja Mahala 42, Visoko

Heated area: 2,740 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of part of the existing joinery/metalwork;
  • Partial replacement of lighting fixtures;
  • Improvement of the central heating system;
  • Installation of pellet boilers;
  • Installation of dynamic thermostatic valves;
  • Replacement of asbestos cover;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 469,385.78
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 124,097.65
Total energy savings (thermal and electrical): 307,004 kWh/year
CO2 emissions: 170 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022