Urgent Medicine Clinic Sarajevo

URGENT MEDICINE CLINIC SARAJEVO

Address: Bolnička 25, Sarajevo

Heated area: 8,481,89 m2


Energy efficiency measures:

  • Thermal insulation of the external walls;
  • Windows and doors replacement;
  • Thermal insulation of the flat roof;
  • Installation of thermostatic valves;
  • Heat Pumps Installation
  • Heat Meter Installation
  • Temperature and Humidity Sensor Installation
  • Remote data reading system instalation

Total investments (BAM with VAT): 2,382,029.15
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 192,918.9
Total energy savings (thermal and electrical):1,369,670.00 kWh/yr
CO2 emissions: 275,0 tCO2/yr
Start of works: 03/02/2022
Works completed/Date of technical acceptance: 29/11/2022

Sarajevo Police Academy

SARAJEVO POLICE ACADEMY

Address: Dobojska 32, Sarajevo

Heated area: 9,959.56 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the roof:
  • Thermal insulation of the ceiling towards the unheated attic;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 944,207.97
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 228,835.67
Total energy savings (thermal and electrical):  2,214.841 kWh/year
CO2 emissions: 425 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Clinic for Pulmonary Diseases Sarajevo

CLINIC FOR PULMONARY DISEASES SARAJEVO

Address: Bardakčije 90, Sarajevo

Heated area: 3,796 m2


Energy efficiency measures:

  • Thermal insulation of the external walls;
  • Thermal insulation of the ceiling below the pitched roof;
  • Windows and doors replacement;
  • Partial replacement of the Lighting Fixtures
  • Heat Meter Installation
  • Temperature and Humidity Sensor Installation
  • Remote data reading system instalation

Total investments (BAM with VAT): 474,796.45
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 36,341,3
Total energy savings (thermal and electrical): 333,209 kWh/year
CO2 emissions: 78,4 tCO2/year
Start of works: 27/01/2022
Works completed/Date of technical acceptance: 08/09/2022

Public Health Institution University Clinical Center Tuzla – Clinic for Laboratory Diagnostics, Tuzla

PUBLIC HEALTH INSTITUTION UNIVERSITY CLINICAL CENTER TUZLA – CLINIC FOR LABORATORY DIAGNOSTICS, TUZLA

Address: Trnovac b.b, Tuzla

Heated area: 2,486 m2


Energy efficiency measures:

  • Thermal insulation of the ceiling towards the unheated attic;
  • Partial replacement of lighting fixture;
  • Improvement of the central heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 127,337.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 13,162.70
Total energy savings (thermal and electrical): 132,534 kWh/year
CO2 emissions: 51 tCO2 /year
Start of works: 15/09/2021
Works completed/Date of technical acceptance: 19/03/2022

Public Health Institution University Clinical Center Tuzla – Clinic for Pulmonary Diseases, Tuzla

PUBLIC HEALTH INSTITUTION UNIVERSITY CLINICAL CENTER TUZLA – CLINIC FOR PULMONARY DISEASES, TUZLA

Address: Slavinovići b.b. Tuzla

Heated area: 3,842.62 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the ceiling towards the unheated attic;
  • Thermal insulation of the unheated basement ceiling;
  • Partial replacement of lighting fixtures;
  • Improvement of the central heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 757,619.79
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 40,705
Total energy savings (thermal and electrical): 471,777 kWh/year
CO2 emissions: 155 tCO2 /year
Start of works: 15/09/2021
Works completed/Date of technical acceptance: 19/03/2022

Public Institution Faculty of Philosophy, University of Zenica

PUBLIC INSTITUTION FACULTY OF PHILOSOPHY, UNIVERSITY OF ZENICA

Address: Zmaja od Bosne 56, Zenica

Heated area: 2,680 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of part of the existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Hydraulic balancing of the heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 647,090.39
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 54,282.63
Total energy savings (thermal and electrical): 344,397 kWh/year
CO2 emissions: 124 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Public InstitutionFaculty of Metallurgy and Technology Zenica

PUBLIC INSTITUTION “FACULTY OF METALLURGY AND TECHNOLOGY, UNIVERSITY OF ZENICA”

Address: Travnička cesta, Zenica

Heated area: 5,819.49 m2


Energy efficiency measures:

  • Thermal insulation facade walls;
  • Replacement of part of the existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,228,476.44
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 101,730
Total energy savings (thermal and electrical): 639,213 kWh/year
CO2 emissions: 171 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Public InstitutionFaculty of Mechanical Engineering, University of Zenica

PUBLIC INSTITUTION FACULTY OF MECHANICAL ENGINEERING, UNIVERSITY OF ZENICA

Address: Fakultetska 3, Zenica

Heated area: 6,216.22 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the roof;
  • Installation of automatic regulation of the heating system;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,082,757.64
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 82,910
Total energy savings (thermal and electrical): 525,377 kWh/year
CO2 emissions: 277 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022