INTERNAL MEDICINE CLINIC WITH DIALYSIS CENTRE, MOSTAR
Zrinskog Frankopana 34, Bijeli Brijeg, Mostar
Heated area: 3,845.09 m2
Energy efficiency measures:
- Thermal insulation of facade walls;
- Thermal insulation of flat and pitched roofs;
- Replacement of existing joinery and/or metalwork;
- Installation of dynamic thermostatic valves;
- Partial replacement of lighting fixtures;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 801,299.06
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 91,983.21
Total energy savings (thermal and electrical): 543,789 kWh/year
CO2 emissions: 191 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 23/03/2023