Internal Medicine Clinic with Dialysis Centre

INTERNAL MEDICINE CLINIC WITH DIALYSIS CENTRE, MOSTAR

Zrinskog Frankopana 34, Bijeli Brijeg, Mostar

Heated area: 3,845.09 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of flat and pitched roofs;
  • Replacement of existing joinery and/or metalwork;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 801,299.06
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 91,983.21
Total energy savings (thermal and electrical): 543,789 kWh/year
CO2 emissions: 191 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 23/03/2023

Clinic for Physical Medicine and Rehabilitation, Clinic for Infectious Diseases, Clinic for Skin and Venereal Diseases and Center for Clinical Pharmacology, SKBM Directorate, MOSTAR – Facility 3

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 3

Kralja Tvrtka b.b., Mostar

Heated Area: 3,597.47 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling towards the unheated attic;
  • Replacement of existing joinery and/or metalwork;
  • Replacement of boiler and energy source;
  • Improvement of the central heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Replacement of asbestos cement roof panels with the new cover made of a steel sheet;

Total investments (BAM with VAT): 691,342.26
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 145,324.36
Total energy savings (thermal and electrical): 571,464 kWh/year
CO2 emissions: 125 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Clinic for Physical Medicine and Rehabilitation, Clinic for Infectious Diseases, Clinic for Skin and Venereal Diseases and Center for Clinical Pharmacology, SKBM Directorate, MOSTAR – Facility 2

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 2

Kralja Tvrtka b.b., Mostar

Heated area: 835,24 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of of the flat roof;
  • Replacement of existing joinery and/or metalwork;
  • Improvement of the central heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 190,350.70
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 22,017.16
Total energy savings (thermal and electrical): 112,185 kWh/year
CO2 emissions: 34 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Clinic for Physical Medicine and Rehabilitation, Clinic for Infectious Diseases, Clinic for Skin and Venereal Diseases and Center for Clinical Pharmacology, SKBM Directorate, MOSTAR – Facility 1

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 1

Kralja Tvrtka b.b., Mostar

Heated area: 582,42 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the flat roof;
  • Replacement of existing joinery and/or metalwork;
  • Improvement of the central heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment ;

Total investments (BAM with VAT): 241,303.06
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 25,810.70
Total energy savings (thermal and electrical): 132,080 kWh/year
CO2 emissions: 37 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Clinic for physical medicine and rehabilitation, Sarajevo

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION SARAJEVO

Address: Bolnička 25, Sarajevo

Heated area: 1,907.53 m2


Energy efficiency measures:

  • Thermal insulation of the external walls;
  • Windows and doors replacement;
  • Thermal insulation of the ceiling below the pitched roof;
  • Thermal insulation of the floor abave unheated;
  • Installation of thermostatic valves;
  • Heat Meter Installation
  • Temperature and Humidity Sensor Installation
  • Remote data reading system instalation

Total investments (BAM with VAT): 792,640,19
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 60.634,57
Total energy savings (thermal and electrical): 430,487 kWh/year
CO2 emissions: 87,0 tCO2/year
Start of works: 03/02/2022
Works completed/Date of technical acceptance: 12/10/2022

Urgent Medicine Clinic Sarajevo

URGENT MEDICINE CLINIC SARAJEVO

Address: Bolnička 25, Sarajevo

Heated area: 8,481,89 m2


Energy efficiency measures:

  • Thermal insulation of the external walls;
  • Windows and doors replacement;
  • Thermal insulation of the flat roof;
  • Installation of thermostatic valves;
  • Heat Pumps Installation
  • Heat Meter Installation
  • Temperature and Humidity Sensor Installation
  • Remote data reading system instalation

Total investments (BAM with VAT): 2,382,029.15
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 192,918.9
Total energy savings (thermal and electrical):1,369,670.00 kWh/yr
CO2 emissions: 275,0 tCO2/yr
Start of works: 03/02/2022
Works completed/Date of technical acceptance: 29/11/2022

Sarajevo Police Academy

SARAJEVO POLICE ACADEMY

Address: Dobojska 32, Sarajevo

Heated area: 9,959.56 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the roof:
  • Thermal insulation of the ceiling towards the unheated attic;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 944,207.97
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 228,835.67
Total energy savings (thermal and electrical):  2,214.841 kWh/year
CO2 emissions: 425 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Clinic for Pulmonary Diseases Sarajevo

CLINIC FOR PULMONARY DISEASES SARAJEVO

Address: Bardakčije 90, Sarajevo

Heated area: 3,796 m2


Energy efficiency measures:

  • Thermal insulation of the external walls;
  • Thermal insulation of the ceiling below the pitched roof;
  • Windows and doors replacement;
  • Partial replacement of the Lighting Fixtures
  • Heat Meter Installation
  • Temperature and Humidity Sensor Installation
  • Remote data reading system instalation

Total investments (BAM with VAT): 474,796.45
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 36,341,3
Total energy savings (thermal and electrical): 333,209 kWh/year
CO2 emissions: 78,4 tCO2/year
Start of works: 27/01/2022
Works completed/Date of technical acceptance: 08/09/2022

Public Health Institution University Clinical Center Tuzla – Clinic for Laboratory Diagnostics, Tuzla

PUBLIC HEALTH INSTITUTION UNIVERSITY CLINICAL CENTER TUZLA – CLINIC FOR LABORATORY DIAGNOSTICS, TUZLA

Address: Trnovac b.b, Tuzla

Heated area: 2,486 m2


Energy efficiency measures:

  • Thermal insulation of the ceiling towards the unheated attic;
  • Partial replacement of lighting fixture;
  • Improvement of the central heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 127,337.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 13,162.70
Total energy savings (thermal and electrical): 132,534 kWh/year
CO2 emissions: 51 tCO2 /year
Start of works: 15/09/2021
Works completed/Date of technical acceptance: 19/03/2022

Public Health Institution University Clinical Center Tuzla – Clinic for Pulmonary Diseases, Tuzla

PUBLIC HEALTH INSTITUTION UNIVERSITY CLINICAL CENTER TUZLA – CLINIC FOR PULMONARY DISEASES, TUZLA

Address: Slavinovići b.b. Tuzla

Heated area: 3,842.62 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the ceiling towards the unheated attic;
  • Thermal insulation of the unheated basement ceiling;
  • Partial replacement of lighting fixtures;
  • Improvement of the central heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 757,619.79
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 40,705
Total energy savings (thermal and electrical): 471,777 kWh/year
CO2 emissions: 155 tCO2 /year
Start of works: 15/09/2021
Works completed/Date of technical acceptance: 19/03/2022