About project
CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 1
Kralja Tvrtka b.b., Mostar
Heated area: 582,42 m2
Energy efficiency measures:
- Thermal insulation of facade walls;
- Thermal insulation of the flat roof;
- Replacement of existing joinery and/or metalwork;
- Improvement of the central heating system;
- Partial replacement of lighting fixtures;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment ;
Total investments (BAM with VAT): 241,303.06
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 25,810.70
Total energy savings (thermal and electrical): 132,080 kWh/year
CO2 emissions: 37 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022