Secondary School of Civil Engineering Juraj Dalmatinac

SECONDARY SCHOOL OF CIVIL ENGINEERING JURAJ DALMATINAC

Address: Kralja Zvonimira 24, Mostar

Heated area: 1,800 m2


Energy efficiency measures:


  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling above the unheated basement;
  • Rehabilitation and thermal insulation of the flat roof Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of the new pellet boilers;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;


Total investments (BAM with VAT): 565,845.87
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 63,371
Total energy savings (thermal and electrical): 152,135 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 12/2016

 

Psychiatric Clinic of the University Clinical Hospital

PSYCHIATRIC CLINIC OF THE UNIVERSITY CLINICAL HOSPITAL

Address: Kneza Mihajla Viševića Humskog 39, Mostar

Area: 4,256 m2


Energy efficiency measures:

 
  • Thermal insulation of facade and the roof
  • Replacement of facade openings
  • Installation of equipment for measuring energy consumption
  • Installation of temperature and humidity monitoring equipment

Total investments (BAM with VAT): 809,352.62
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 102,470
Total energy savings (thermal and electrical): 503,455.00 kWh/year
CO2 emissions: 147 tCO2/year
Works completed: 06/2016

Elementary School Crnići

ELEMENTARY SCHOOL CRNIĆI

Address: Crnići bb, Stolac

Heated area: 704 m2


Energy efficiency measures:

 
  • Thermal insulation of the ceiling under the roof;
  • Thermal insulation of the facade;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of new radiators;
  • Installation of the new pellet boiler;

Total investments (BAM with VAT): 254,538.79 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 3,834 
Total energy savings (thermal and electrical): 49,078.00 kWh/year
CO2 emissions: 3 tCO2 /year
Works completed: 12/2016

Clinical Centre of the University of Sarajevo – Clinic for orthopedics and traumatology

CLINICAL CENTRE OF THE UNIVERSITY OF SARAJEVO – CLINIC FOR ORTHOPEDICS AND TRAUMATOLOGY

Address: Bolnička 25, Sarajevo

Heated area: 7,382 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,257.394,21 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 110,075 
Total energy savings (thermal and electrical): 781,669.00 kWh/year
CO2 emissions: 167 tCO2 /year
Works completed: 07/2016

Public Institution Elementary School Zahid Baručija

PUBLIC INSTITUTION ELEMENTARY SCHOOL ZAHID BARUČIJA

Address: Omladinska 14, Sarajevo

Heated area: 1,782 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Reconstruction and thermal insulation of the flat roof;
  • Replacement of facade openings;
  • Installation of daylight sensors;
  • Cleaning of heating elements in the gymnasium;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 267,573.47 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 28,725 
Total energy savings (thermal and electrical): 168,646.00  kWh/year
CO2 emissions: 65 tCO2 /year
Works completed: 11/2016

Public Institution Elementary School Srednje

PUBLIC INSTITUTION ELEMENTARY SCHOOL SREDNJE

Address: Srednje bb, Ilijaš

Heated area: 2,346 m2


Energy efficiency measures:

 

  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of the new pellet boiler;
  • Installation of additional heating elements/radiators;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Replacement of energy source;

Total investments (BAM with VAT): 488,870.16 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 56,564
Total energy savings (thermal and electrical): 210,281.00  kWh/year
CO2 emissions: 86 tCO2 /year
Works completed: 11/2016

Public Institution Elementary School Hašim Spahić

PUBLIC INSTITUTION ELEMENTARY SCHOOL HAŠIM SPAHIĆ

Address: Krajiška bb, 71000 Sarajevo

Heated area: 2,539 m2


Energy efficiency measures:

 

  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling towards the attic and the roof of the sports hall Installation of dynamic thermostatic radiator valves;
  • Hydraulic balancing of the heating system;
  • Automatic regulation for the heating system;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 450,273.48 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 20,317
Total energy savings (thermal and electrical): 414,342.00 kWh/year
CO2 emissions: 91 tCO2 /year
Works completed: 11/2016

University Clinical Center Tuzla – Clinic for Surgical Branches Tuzla

UNIVERSITY CLINICAL CENTER TUZLA – CLINIC FOR SURGICAL BRANCHES TUZLA

Address: Rate Dugonjića bb, Tuzla

Heated area: 11,450 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade
  • Replacement of external joinery
  • Regulation of the heating system by means of three-way valves
  • Installation of equipment for measuring energy consumption, as well as equipment for monitoring temperature and humidity

Total investments (BAM with VAT): 1,037,923.25
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 126,861
Total energy savings (thermal and electrical): 1,822.604.00 kWh/year
CO2 emissions: 285 tCO2 /year
Works completed: 06/2016

Public Institution First Elementary School Zavidovići

PUBLIC INSTITUTION FIRST ELEMENTARY SCHOOL ZAVIDOVIĆI

Address: Safvet bega Bašagića 10, Zavidovići

Heated area: 2,620 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade and ceiling;
  • Replacement of facade openings;
  • Installation of dynamic thermostatic valves;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 362,783.27
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 11,693
Total energy savings (thermal and electrical): 299,767.00 kWh/year
CO2 emissions: 88 tCO2 /year
Works completed: 11/2016

Public Institution Elementary School Musa Cazim Catic

PUBLIC INSTITUTION ELEMENTARY SCHOOL MUSA CAZIM CATIC

Address: Školska 23, Zenica

Heated area: 3,423 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Improvement of the central heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 455,782.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 49,213
Total energy savings (thermal and electrical): 363,661.00 kWh/year
CO2 emissions: 100 tCO2 /year
Works completed: 11/2016