Public Institution Elementary School Hamdija Kresevljakovic, Kakanj

PUBLIC INSTITUTION ELEMENTARY SCHOOL HAMDIJA KRESEVLJAKOVIC, KAKANJ

Address: Šehida 2, Kakanj

Heated area: 3,120 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade and ceiling of the pitched roof;
  • Replacement of facade openings;
  • Improvement of the central heating system;
  • Installation of dynamic thermostatic radiator valves;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment

Total investments (BAM with VAT): 332,627.59
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 49,894
Total energy savings (thermal and electrical): 368,745.00 kWh/year
CO2 emissions: 100 tCO2 /year
Works completed: 11/2016

Tešanj General Hospital

TEŠANJ GENERAL HOSPITAL

Address: Braće Pobrić, Tešanj

Heated area: 5,844 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the attic and roof;
  • Installation of new pellet boilers;
  • Reconstruction of the roof;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 718,293.76
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 161,082
Total energy savings (thermal and electrical): 686,930.00 kWh/year
CO2 emissions: 130 tCO2 /year
Works completed: 11/2016

Combined Secondary School, Žepče

COMBINED SECONDARY SCHOOL, ZEPCE

Address: Zagrebačka 2, Žepče

Heated area: 1,860 m2


Energy efficiency measures:

 

  • Thermal insulation of facade and the ceiling of the sloping roof;
  • Partial replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Improvement of the central heating system;

Total investments (BAM with VAT): 170,792.39
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 22,152
Total energy savings (thermal and electrical): 158,650.00 kWh/year
CO2 emissions: 28 tCO2 /year
Works completed: 11/2016