Mixed Industrial High School Zenica

MIXED INDUSTRIAL HIGH SCHOOL ZENICA


Address: Bulevar Kralja Tvrtka I, Zenica


Heated area: 3,514 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Roof thermal insulation;
  • Replacement of existing carpentry / locksmith;
  • Installation of thermostatic valves;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 783,619

Total energy savings (thermal and electrical): 541,150 kWh/year
CO2 emissions: 158,6 tCO2/year
Start of works: 20/10/2022
Works completed/Date of technical acceptance: 24/03/2023

“Mehmedalija Mak Dizdar” High School i “Mushin Rizvić” Gymnasium, Breza

“MEHMEDALIJA MAK DIZDAR” HIGH SCHOOL   I “MUSHIN RIZVIĆ” GYMNASIUM, BREZA


Address: Šehidska 34,  Breza


Heated area: 3,328 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of existing carpentry / locksmith;
  • Installation of thermostatic valves;
  • Boiler and energy source replacement;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 821,871.41 BAM

Total energy savings (thermal and electrical): 877,218 kWh/year
CO2 emissions: 79,5 tCO2/year

Start of works: 20/10/2022
Works completed/Date of technical acceptance: 24/03/2023

Primary School “Miroslav Krleža”, Zenica

PRIMARY SCHOOL “MIROSLAV KRLEŽA”


Address: Travnička cesta,  Zenica


Heated area: 3,443 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Installation of thermostatic valves;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 447,541.72

Total energy savings (thermal and electrical): 336,851kWh/year
CO2 emissions: 95 tCO2/year
Start of works: 20/10/2022
Works completed/Date of technical acceptance: 24/03/2023

Public Institution Faculty of Philosophy, University of Zenica

PUBLIC INSTITUTION FACULTY OF PHILOSOPHY, UNIVERSITY OF ZENICA

Address: Zmaja od Bosne 56, Zenica

Heated area: 2,680 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of part of the existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Hydraulic balancing of the heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 647,090.39
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 54,282.63
Total energy savings (thermal and electrical): 344,397 kWh/year
CO2 emissions: 124 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Public InstitutionFaculty of Metallurgy and Technology Zenica

PUBLIC INSTITUTION “FACULTY OF METALLURGY AND TECHNOLOGY, UNIVERSITY OF ZENICA”

Address: Travnička cesta, Zenica

Heated area: 5,819.49 m2


Energy efficiency measures:

  • Thermal insulation facade walls;
  • Replacement of part of the existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,228,476.44
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 101,730
Total energy savings (thermal and electrical): 639,213 kWh/year
CO2 emissions: 171 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Public InstitutionFaculty of Mechanical Engineering, University of Zenica

PUBLIC INSTITUTION FACULTY OF MECHANICAL ENGINEERING, UNIVERSITY OF ZENICA

Address: Fakultetska 3, Zenica

Heated area: 6,216.22 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the roof;
  • Installation of automatic regulation of the heating system;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 1,082,757.64
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 82,910
Total energy savings (thermal and electrical): 525,377 kWh/year
CO2 emissions: 277 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022

Elementary School “Kulin ban” Visoko

ELEMENTARY SCHOOL “KULIN BAN” VISOKO

Address: Gornje Rosulje 1, Visoko

Heated area: 3,007.74 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of part of the existing joinery/metalwork and replacement of glazing;
  • Improvement of the central heating system;
  • Installation of gas boilers;
  • Installation of dynamic thermostatic valves;
  • Installation of piping and new radiators;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 640,828.53
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 76,196.11
Total energy savings (thermal and electrical): 386,854 kWh/year
CO2 emissions: 185 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022

Public Institution Elementary School “Skender Kulenović”, Zenica

PUBLIC INSTITUTION ELEMENTARY SCHOOL “SKENDER KULENOVIĆ”, ZENICA

Address: Radakovo, Zenica

Heated area: 3,460.62 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of existing joinery/metalwork;
  • Installation of dynamic thermostatic valves;
  • Installation of automatic regulation of the heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 462,843.05
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 55,525.24
Total energy savings (thermal and electrical): 307,851 kWh/year
CO2 emissions: 76 tCO2 /year
Start of works: 08/10/2022
Works completed/Date of technical acceptance: 17/05/2022