Diagnostic annex SKB Mostar – JZU SKB Mostar

Diagnostic annex SKB Mostar – JZU SKB Mostar

Address: Bijeli brijeg bb, Mostar

Heated area: 3.061 m2


Energy efficiency measures:

  • Thermal insulation of facade walls
  • Replacement of existing carpentry/locksmith;
  • Improvement of the thermomechanical system,
  • Partial replacement of lighting fixtures.


Total investments (BAM with VAT): 581.709,00

Total energy savings (thermal and electrical): 133.035,00 kWh/year

CO2 emissions: 60 tCO2/year

Start of works: 10/10/2023

JU Center for Culture “National University Konjic”

JU Center for Culture “National University Konjic”

Address: Varda bb, Konjic

Heated area: 3,578 m2


Energy efficiency measures:

  • Painting of metal fences, posts and masts;Replacement of windows and doors;
  • Part of facade works; 
  • Works on the summer scene;


Total investments (BAM with VAT): 80,007.53

Total energy savings (thermal and electrical): 502.729 kWh/yr

CO2 emissions: 312 tCO2/yr

Federation Government Building, Mostar

FEDERATION GOVERNMENT BUILDING, MOSTAR


Address: Ante Starčevića bb, Mostar


Heated area: 4,351 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation and reconstruction of a flat roof;
  • Replacement of existing hardware;
  • More advanced thermotechnical system-installation of heat pump;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 1,075,698.00

Total energy savings (thermal and electrical): 142,275 kWh/year
CO2 emissions: 34 tCO2/year

County / Cantonal Court In Mostar

COUNTY / CANTONAL COURT IN MOSTAR


Address: Ante Starčevića 22, Mostar


Heated area: 2,005 m2


Energy efficiency measures:

  • Thermal insulation of facade walls, ceiling and roof;
  • Replacement of existing carpentry;
  • Improving the central heating system;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 912,155.51

Total energy savings (thermal and electrical): 602.093 kWh/year
CO2 emissions: 2,1 tCO2/year
Start of works: 10/11/2022
Works completed/Date of technical acceptance: 10/03/2023

Internal Medicine Clinic with Dialysis Centre

INTERNAL MEDICINE CLINIC WITH DIALYSIS CENTRE, MOSTAR

Zrinskog Frankopana 34, Bijeli Brijeg, Mostar

Heated area: 3,845.09 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of flat and pitched roofs;
  • Replacement of existing joinery and/or metalwork;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 801,299.06
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 91,983.21
Total energy savings (thermal and electrical): 543,789 kWh/year
CO2 emissions: 191 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 23/03/2023

Clinic for Physical Medicine and Rehabilitation, Clinic for Infectious Diseases, Clinic for Skin and Venereal Diseases and Center for Clinical Pharmacology, SKBM Directorate, MOSTAR – Facility 3

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 3

Kralja Tvrtka b.b., Mostar

Heated Area: 3,597.47 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling towards the unheated attic;
  • Replacement of existing joinery and/or metalwork;
  • Replacement of boiler and energy source;
  • Improvement of the central heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Replacement of asbestos cement roof panels with the new cover made of a steel sheet;

Total investments (BAM with VAT): 691,342.26
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 145,324.36
Total energy savings (thermal and electrical): 571,464 kWh/year
CO2 emissions: 125 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Clinic for Physical Medicine and Rehabilitation, Clinic for Infectious Diseases, Clinic for Skin and Venereal Diseases and Center for Clinical Pharmacology, SKBM Directorate, MOSTAR – Facility 2

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 2

Kralja Tvrtka b.b., Mostar

Heated area: 835,24 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of of the flat roof;
  • Replacement of existing joinery and/or metalwork;
  • Improvement of the central heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 190,350.70
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 22,017.16
Total energy savings (thermal and electrical): 112,185 kWh/year
CO2 emissions: 34 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Clinic for Physical Medicine and Rehabilitation, Clinic for Infectious Diseases, Clinic for Skin and Venereal Diseases and Center for Clinical Pharmacology, SKBM Directorate, MOSTAR – Facility 1

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 1

Kralja Tvrtka b.b., Mostar

Heated area: 582,42 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the flat roof;
  • Replacement of existing joinery and/or metalwork;
  • Improvement of the central heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment ;

Total investments (BAM with VAT): 241,303.06
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 25,810.70
Total energy savings (thermal and electrical): 132,080 kWh/year
CO2 emissions: 37 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Health Centre Čitluk

HEALTH CENTRE ČITLUK

Stjepana Radića 3, Čitluk

Heated area: 2,004.6 m2


Energy efficiency measures:

 

  • Replacement of facade openings
  • Thermal insulation of walls

Total investments (BAM with VAT): 252,696.58 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 41,648.00
Total energy savings (thermal and electrical):  302.007 kWh/year
CO2 emissions: 33 tCO2 /year
Works completed: 10/2020