Public Institution Cultural Centre for culture “People’s Univerzity of Konjic”

PUBLIC INSTITUTION CULTURAL CENTRE PEOPLE’S UNIVERSITY OF KONJIC

Varda bb, Konjic

Heated area: 3,578 m2


Energy efficiency measures:

 
  • Thermal insulation of external walls;
  • Thermal insulation of the ceiling;
  • Replacement of facade openings;
  • Replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 669,088.01 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 92,985.00
Total energy savings (thermal and electrical): 502,729 kWh/year
CO2 emissions: 312 tCO2 /year
Works completed: 10/2020

Public Institution Secondary School Prozor-Rama

PUBLIC INSTITUTION SECONDARY SCHOOL PROZOR-RAMA

Kralja Tomislava bb, Prozor-Rama

Heated area: 1,905 m2

Energy efficiency measures:

  • Thermal insulation of external walls;
  • Renovation of the roof structure, replacement of the roof covering and thermal insulation of the ceiling above the heated space;
  • Improvement of the heating system;
  • Partial replacement of facade openings;

Total investments (BAM with VAT): 200.739.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 38,038.00
Total energy savings (thermal and electrical): 101,855.00 kWh/year
CO2 emissions: 57 tCO2 /year
Works completed: 10/2020

Ambulance Building Čapljina

Ambulance Building Čapljina

Fra Didaka Buntića bb, Čapljina

Area: 2.471,5 m2

Energy efficiency measures:

  • Thermal insulation of external walls
  • Replacement of the external openings
  • Improvement of ceilings above heated area

Estimated investment for energy efficiency measures: 239.836,17 BAM

Estimated savings in energy costs after the implementation of schemes (BAM with VAT): 69.510,00

Expected annual CO2 emission reduction of 188 tCO2/yr
Expected annual energy savings: 302.077 kWh/yr

Secondary Transportation School/ Secondary School of Mechanical Engineering and Transportation

SECONDARY TRANSPORTATION SCHOOL/SECONDARY SCHOOL OF MECHANICAL ENGINEERING AND TRANSPORTATION

Address: Dr. Mile Budaka br.26, Mostar

Heated area: 2,900 m2


Energy efficiency measures:

 

  • Replacement of facade openings;
  • Thermal insulation of external walls;
  • Thermal insulation of the ceiling above the heated space;
  • Installation of the new pellet boiler;
  • Replacement of energy source;
  • Partial replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 403,202.32 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 60,386
Total energy savings (thermal and electrical): 284,898 kWh/year
CO2 emissions: 121 tCO2 /year
Works completed: 10/2020

Public Institution Elementary School “Antun Branko Šimić”

PUBLIC INSTITUTION ELEMENTARY SCHOOL ANTUN BRANKO ŠIMIĆ

Address:  Kraljice Katarine 38, 88 000 Mostar

Heated area: 3,585 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling above the unheated basement;
  • Thermal insulation of the envelope of the flat roof with additional thermal insulation;
  • Thermal insulation of the ceiling with additional thermal insulation;
  • Renovation of the roof structure and replacement of the roof covering;
  • Replacement of facade openings;
  • Improvement of the electricity consumption system;
  • Improvement of the central heating system;

Total investments (BAM with VAT): 792,865.39 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 57,607 
Total energy savings (thermal and electrical): 603,825.00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 5/2019

Public Institution Elementary School Ivan Gandulić Mostar

PUBLIC INSTITUTION ELEMENTARY SCHOOL IVAN GUNDULIĆ MOSTAR

Address: Rudarska 87, 88 000 Mostar

Heated area: 1,980 m2


Energy efficiency measures:

 

  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Thermal insulation of the flat roof;
  • Installation of the new pellet boiler;
  • Installation of dynamic thermostatic radiator valves;
  • Replacement of circulation pumps;

Total investments (BAM with VAT): 466,830 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,941 
Total energy savings (thermal and electrical): 125,994.00 kWh/year
CO2 emissions: 66 tCO2 /year
Works completed: 5/2019

Public Institution Sixth Elementary School Mostar

PUBLIC INSTITUTION SIXTH ELEMENTARY SCHOOL MOSTAR

Address: Alekse Šantića 10, 88 000 Mostar

Heated area: 2,269 m2


Energy efficiency measures:

 

  • Partial replacement of existing joinery
  • Thermal insulation of façade
  • Thermal insulation of ceiling construction and flat roofs
  • Replacement of the sports hall cover
  • Installation of thermostatic valves
  • Replacement of boiler and energy source

Total investments (BAM with VAT): 375,247.28 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 39,485 
Total energy savings (thermal and electrical): 110,354.00 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 5/2019

Public Institution Drežnica, Elementary School

PUBLIC INSTITUTION DREŽNICA ELEMENTARY SCHOOL

Address: Donja Drežnica bb, Mostar

Heated area: 1,768 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Renovation of part of the roof covering with all necessary layers;
  • Installation of thermostatic valves on radiators;
  • Rehabilitation of the radiator heating of the sports hall;
  • Partial replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 440,403.75 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 6,698
Total energy savings (thermal and electrical):141.840,00 kWh/year
CO2 emissions: 2 tCO2 /year
Works completed: 6/2018

Secondary school Jablanica

SECONDARY SCHOOL JABLANICA

Address: Zlatnih ljiljana br.4, Jablanica

Area: 2,011 m2


Energy efficiency measures:



  • Thermal insulation of facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Renovation of the roof structure and replacement of the roof covering;
  • Partial replacement of lighting fixtures with more energy efficient; ones;
  • Replacement of energy source;
  • Installation of the new pellet boiler;
  • Adaptation of the existing boiler room for new needs;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Improvement of the central heating system;

Total investments (BAM with VAT): 488,456.20 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 24,379 
Total energy savings (thermal and electrical): 118,955.00 kWh/year
CO2 emissions: 50 tCO2/year
Works completed: 7/2018

Public Institution Elementary school Cardinal Stepinac

PUBLIC INSTITUTION ELEMENTARY SCHOOL CARDINAL STEPINAC

Address: Stjepana Radića bb, Neum

Heated area: 1,484 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Thermal insulation of the roof along the slope of the roof plane between the rafters – mineral wool; 

Total investments (BAM with VAT): 211,683.38 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 30,383 
Total energy savings (thermal and electrical): 181,666.00 kWh/year
CO2 emissions: 60 tCO2/year
Works completed: 7/2018