About project

FEDERATION GOVERNMENT BUILDING, MOSTAR


Address: Ante Starčevića bb, Mostar


Heated area: 4,351 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation and reconstruction of a flat roof;
  • Replacement of existing hardware;
  • More advanced thermotechnical system-installation of heat pump;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 1,075,698.00

Total energy savings (thermal and electrical): 142,275 kWh/year
CO2 emissions: 34 tCO2/year

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano