Navigation

Public Institution for the Care of Mentally Disabled Children and Youth, Pazarić

About project

PUBLIC INSTITUTION FOR THE CARE OF MENTALLY DISABLED CHILDREN AND YOUTH, PAZARIĆ


Address: Resnik b.b. Pazarić


Heated area: 358 m2


Energy efficiency measures:

  • Thermal insulation of facade walls,
  • Thermal insulation of the roof towards the attic;
  • Installation of thermostatic valves;
  • Partial replacement of lighting fixtures.


Total investments (BAM with VAT): 210,013.30

Total energy savings (thermal and electrical): 345.637 kWh/year

CO2 emissions: 320 tCO2/year

Start of works: 27/10/2022
Works completed/Date of technical acceptance: 18/01/2023

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano