About project
CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 2
Kralja Tvrtka b.b., Mostar
Heated area: 835,24 m2
Energy efficiency measures:
- Thermal insulation of facade walls;
- Thermal insulation of of the flat roof;
- Replacement of existing joinery and/or metalwork;
- Improvement of the central heating system;
- Partial replacement of lighting fixtures;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 190,350.70
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 22,017.16
Total energy savings (thermal and electrical): 112,185 kWh/year
CO2 emissions: 34 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022