CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION, CLINIC FOR SKIN AND VENEREAL DISEASES AND CENTER FOR CLINICAL PHARMACOLOGY, SKBM DIRECTORATE, MOSTAR – FACILITY 2

Kralja Tvrtka b.b., Mostar

Heated area: 835,24 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of of the flat roof;
  • Replacement of existing joinery and/or metalwork;
  • Improvement of the central heating system;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 190,350.70
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 22,017.16
Total energy savings (thermal and electrical): 112,185 kWh/year
CO2 emissions: 34 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano