Public Institution for the Care of Mentally Disabled Children and Youth, Pazarić

PUBLIC INSTITUTION FOR THE CARE OF MENTALLY DISABLED CHILDREN AND YOUTH, PAZARIĆ


Address: Resnik b.b. Pazarić


Heated area: 358 m2


Energy efficiency measures:

  • Thermal insulation of facade walls,
  • Thermal insulation of the roof towards the attic;
  • Installation of thermostatic valves;
  • Partial replacement of lighting fixtures.


Total investments (BAM with VAT): 210,013.30

Total energy savings (thermal and electrical): 345.637 kWh/year

CO2 emissions: 320 tCO2/year

Start of works: 27/10/2022
Works completed/Date of technical acceptance: 18/01/2023