PUBLIC INSTITUTION SECONDARY SCHOOL GYMNASIUM MUHSIN RIZVIC
Address: Ulica šehida 32, 72 240 Kakanj
Heated area: 2,240 m2
Heated area: 2,240 m2
Thermal insulation of the ceiling;
Replacement of facade openings;
Partial thermal insulation of the facade and production of the final facade layer;
Installation of equipment for measuring energy consumption;
Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 143,885.87 Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 32,190 Total energy savings (thermal and electrical): 104,920.14 kWh/year CO2 emissions: 27 tCO2 /year Works completed: 05/2019
PUBLIC INSTITUTION ELEMENTARY SCHOOL ANTUN BRANKO ŠIMIĆ
Address: Kraljice Katarine 38, 88 000 Mostar
Heated area: 3,585 m2
Energy efficiency measures:
Thermal insulation of the facade;
Thermal insulation of the ceiling above the unheated basement;
Thermal insulation of the envelope of the flat roof with additional thermal insulation;
Thermal insulation of the ceiling with additional thermal insulation;
Renovation of the roof structure and replacement of the roof covering;
Replacement of facade openings;
Improvement of the electricity consumption system;
Improvement of the central heating system;
Total investments (BAM with VAT): 792,865.39 Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 57,607 Total energy savings (thermal and electrical): 603,825.00 kWh/year CO2 emissions: 0 tCO2 /year (before the renovation, biomass was also used as the primary energy source) Works completed: 5/2019
PUBLIC INSTITUTION ELEMENTARY SCHOOL IVAN GUNDULIĆ MOSTAR
Address: Rudarska 87, 88 000 Mostar
Heated area: 1,980 m2
Energy efficiency measures:
Replacement of facade openings;
Thermal insulation of the facade;
Thermal insulation of the flat roof;
Installation of the new pellet boiler;
Installation of dynamic thermostatic radiator valves;
Replacement of circulation pumps;
Total investments (BAM with VAT): 466,830 Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,941 Total energy savings (thermal and electrical): 125,994.00 kWh/year CO2 emissions: 66 tCO2 /year Works completed: 5/2019
Thermal insulation of ceiling construction and flat roofs
Replacement of the sports hall cover
Installation of thermostatic valves
Replacement of boiler and energy source
Total investments (BAM with VAT): 375,247.28 Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 39,485 Total energy savings (thermal and electrical): 110,354.00 kWh/year CO2 emissions: 62 tCO2 /year Works completed: 5/2019
One year later, with the same flight Bosnia Energy Efficiency Project and Via Media, flew to RSVP festival from where they returned with two Attend awards in the categories “Best Non Profit/ Socially Beneficial Event” and “Best B2B / B2C / Interiors Event.”
“Dear passengers to your own future, sit comfortably at the present, follow our instructions and find out where you are going to land in 2030., and what is the price of your trip.”
With these words of the imaginary air campaign Air Future cabin crew, the last year’s journey to an energy-efficient future began. One year later, with the same flight Bosnia Energy Efficiency Project and Via Media, flew to RSVP festival from where they returned with two Attend awards in the categories “Best Non Profit/ Socially Beneficial Event” and “Best B2B / B2C / Interiors Event.”
The campaign, whose creative concept is signed by the Via Media agency, is responder to the increasing air pollution, with which the citizens of Bosnia and Herzegovina, and beyond, have faced more and more in recent years. The main causes of this problem can be found in the irrational use of energy.
Although primarily focused on the reconstruction of public facilities in the FBiH, one of the important tasks of the Bosnia Energy Efficiency Project is to educate the public about the necessity of energy-efficient behavior. The Air Future campaign aimed at raising public awareness of the importance of energy efficiency, as well as direct benefits of smart energy use presenting the image of the future that each individual expects, if that energy is scattered.
For the Bosnia Energy Efficiency Project this is a confirmation of successful work and an indicator that it is the right path to implementing project activities. Cooperation with the agency Via Media, a great idea and a great campaign, resulted with these awards, which are certainly additional incentives for further work, in order to encourage all citizens to behave responsibly.