Public Institution Elementary school „Isak Samokovlija“

PUBLIC INSTITUTION ELEMENTARY SCHOOL ISAK SAMOKOVLIJA

Address: Fra Anđela Zvizdovića 1, 71 000 Sarajevo

Heated area: 2,383m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the roof;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 601,044.05
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 162,743
Total energy savings (thermal and electrical): 180,659.00 kWh/year
CO2 emissions: 56 tCO2 /year
Works completed: 03/2018

Ivan Fra Frane Jukića Elementary School

IVAN FRA FRANE JUKIĆA ELEMENTARY SCHOOL

Address: Sivša bb, Usora

Heated area: 488 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling towards the attic;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of the new pellet boiler;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 86,483.84
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 4,899
Total energy savings (thermal and electrical): 14,517.00 kWh/year
CO2 emissions: 21 tCO2 /year
Works completed: 04/2018

Clinic for Neurology and Psychiatry, Clinical Centre of the University of Sarajevo

CLINIC FOR NEUROLOGY AND PSYCHIATRY, CLINICAL CENTRE OF THE UNIVERSITY OF SARAJEVO

Adress: Bolnička 25, 71000 Sarajevo

Heated area: 5,704 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Thermal insulation of the mezzanine structures above the unheated basement;
  • Renovation of part of the roof covering and flat roof terraces in the central part of the building;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of circulation pumps;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity;
  • Improvement of the central heating system

Total investments (BAM): 1,163,028.18
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 183,164
Total energy savings (thermal and electrical): 781,669.00 kWh/year
CO2 emissions: 226 tCO2 /year
Works completed: 06/2018

Cantonal Hospital “Fra Mihovil Sučić”

CANTONAL HOSPITAL FRA MIHOVIL SUČIĆ

Address: Svetog Ive 2, Livno

Heated area: 5,530 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Partial restoration of the roof;
  • Installation of a system of solar collectors for PTV;
  • Thermal insulation of internal walls towards unheated space;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Improvement of the reactive component electricity consumption system, i.e. installation of the electrical energy compensation circuit;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 496,308.17 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 81,746
Total energy savings (thermal and electrical): 556,569.00 kWh/year
CO2 emissions: 30 tCO2 /year
Works completed: 03/2018

Health Centre Tomislavgrad

HEALTH CENTRE TOMISLAVGRAD

Address: Mije Ferića bb, Tomislavgrad

Heated area: 4,921 m2


Energy efficiency measures:

 

  • Thermal insulation of façade
  • Replacement of existing joinery and/or hardware
  • Ceiling insulation
  • Replacement of existing incandescent bulbs with energy-saving light bulbs
  • Installation of two pellet boilers
  • Installation of equipment for measuring energy consumption and for monitoring temperature and humidity

Total investments (BAM with VAT): 357,545.25 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 45,393 
Total energy savings (thermal and electrical): 543,789 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 04/2018

RADOVI EE

Implementacija mjera energetske efikasnosti na objektima: Policijska akademija (Objekat A), Zatvor Igman, Federalno ministarstvo finansija, Zatvor Bihać, JU Zavod Pazarić (Paviljon 8), JU Osnovna škola „Isak Samokovlija“ u Sarajevu

POZIV ZA DOSTAVLJANJE PONUDA

(NABAVKA RADOVA)

Bosna i Hercegovina

Projekat  energetska efikasnost u Bosni i Hercegovini

Broj zajma/ broj kredita / broj donacije: Broj kredita 5393-BA; br.  5538-BA

Naziv ugovora:  Implementacija mjera energetske efikasnosti na objektima: Policijska akademija (Objekat A), Zatvor Igman, Federalno ministarstvo finansija, Zatvor Bihać, JU Zavod Pazarić (Paviljon 8), JU Osnovna škola „Isak Samokovlija“ u Sarajevu

 

BEEP-P143580-NCB-37-W-16-FBIH

Bosna i Hercegovina je zajmoprimac, a Federacija Bosne i Hercegovine je kroz Ugovor o sufinansiranju sa zajmoprimcem, dobila sredstava Svjetske banke za potrebe finansiranja projekta “Energetska efikasnost u Bosni i Hercegovini” i namjerava upotrijebiti dio sredstava za plaćanja predviđena prema ugovoru za nabavku radova za: Implementaciju mjera energetske efikasnosti na objektima: Policijska akademija (Objekat A), Zatvor Igman, Federalno ministarstvo finansija, Zatvor Bihać, JU Zavod Pazarić (Paviljon 8), JU Osnovna škola „Isak Samokovlija“ u Sarajevu.

Kanton Sarajevo namjerava  da aplicira za kreditna sredstva kod  Federalnog ministarstva finansija namijenjena za Projekat energetske efikasnosti za Bosnu i Hercegovinu, i namjerava koristiti ta sredstava za plaćanje ugovora za izvođenje građevinskih radova s ciljem implementacije mjera energetske efikasnosti na objektu  JU Osnovna škola „Isak Samokovlija“ u Sarajevu.

Federalno ministarstvo prostornog uređenja (FMPU) putem Jedinice za implementaciju projekata (PIU) poziva kvalificirane ponuđače da dostave zapečaćene ponude za izvedbu radova koji se sastoje od adaptacije javnih objekata u Federaciji Bosne i Hercegovine u svrhu ostvarenja energetske efikasnosti koji općenito obuhvataju arhitektonsko-građevinske, mašinske i elektro radove. Implementacija mjera energetske efikasnosti u okviru Projekta sastoji se između ostalog od: zamjenu otvora (vrata i prozora) (cca 1637 m2, 333 komada), termo izolacija fasade (cca 8071 m2), i zamjenu kotlovskog postrojenja (za dva objekta).

Kvalifikacioni zahtjevi:

a. Ponuđač je obavezan dostaviti potvrdu da nema neizmirenih poreskih obaveza

b. Minimalan prosječni godišnji obim građevinskih radova u protekle tri (3) godine mora biti minimalno 7.900.000,00 KM, koji se obračunava kao ukupan iznos isplaćen za tekuće ugovore i/ili okončane ugovore u protekle tri (3) godine, podijeljeno sa tri (3) godine (januar 2014 – januar 2017)

c. Posebno iskustvo u izvođenju sličnih radova i to najmanje u jednom (1) ugovoru, sličnom predmetnim radovima (fizički obim, kompleksnost, metode/tehnologija) u minimalnom iznosu od 1.600.000,00 KM u period između 01. janura 2012 i datuma podnošenja zahtjeva. Za gore navedene i druge tekuće i/ili okončane ugovore, minimalno iskustvo u sljedećim ključnim aktivnostima: jedan (1) ugovor u minimalnom iznosu od 1.000.000,00 KM za nabavku i ugradnju otvora (prozora i ulaznih vrata); (ii) jedan (1) ugovor, u minimalnom iznosu od 600.000,00 KM za nabavku i ugradnju fasade;

  1. Proces nabavke će biti izvršen prema procedure Svjetske banke (NCB – National Competitive Bidding) kao što je navedeno u Smjernicama Svjetske banke: Nabavka robe, radova i nekonsultantskih usluga u okviru IBRD kredita i IDA zajmova za potrebe zajmoprimaca Svjetske banke izdanje Januar 2011 (“Smjernice o nabavkama”), i otvoreno je za sve kvalifikovane ponuđače u skladu sa Smjernicama za nabavku. Pored toga, potrebno je obratiti pažnju na stavove 1.6 i 1.7 kojima se definiše politika Svjetske banke o sukobu interesa.
  2. Zainteresovani kvalifikovani ponuđači mogu se obratiti za više informacija na adresu navedenu ispod ovog poziva i dobiti uvid u konkursnu dokumentaciju tokom radnog vremena od 9.00h do 15.00h na adresi datoj u daljem tekstu.
  3. Zainteresovani kvalifikovani ponuđači mogu preuzeti cjelokupan paket konkursne dokumentacije na lokalnim jezicima uz podnošenje pisanog zahtjeva na dole navedenu adresu.
  4. Ponude se moraju dostaviti na dole navedenu adresu najkasnije do 28.06.2017.godine u 12.00h. Elektronske ponude nisu dozvoljene. Zakašnjele ponude se neće prihvatiti. Ponude se otvaraju javno u prisustvu ovlaštenih predstavnika svih ponuđača i drugih lica koja žele da prisustvuju na dole navedenoj adresi 28.06.2017.godine u 12.05 h.
  5. Uz ponude se obavezno prilaže bankarska garancija u iznosu od 32.000,00 KM.
  6. Gore pomenuta adresa je:

Federalno ministarstvo prostornog uređenja

Jedinica za implementaciju projekta “Energetska efikasnost u Bosni i  Hercegovini” za Federaciju Bosne i Hercegovine

Marka Marulića 2, 71000 Sarajevo

(II sprat, soba 210)

Tel: 00387 33 726 511

Fax: 00387 33 726 511