Representatives of the World Bank are pleased with the continued implementation of the BEEP project

World Bank representatives have completed another seven-day visit to Bosnia and Herzegovina as part of a mid-term review of the implementation of the Bosnia Energy Efficiency Project.

 

World Bank representatives have completed another seven-day visit to Bosnia and Herzegovina as part of a mid-term review of the implementation of the Bosnia Energy Efficiency Project (BEEP), which is being implemented by the Federation of Bosnia and Herzegovina within the Federal Ministry of Physical Planning.

 

 

During the seven-day visit, apart from the Federal Minister of Physical Planning, Mr. Josip Martic, delegation members held meetings with the Implementation Unit of the project.

The meetings highlighted the mutual satisfaction with the previous implementation through the achievement of all 2016 plans. Also, ambitious plans for 2017 were discussed as well as views on the future of the project. At the end of the mission, in Banja Luka were organized joint meetings of the two entity implementation units of the project.

 

 

The World Bank delegation, among other things, visited the “Srednje” Elementary School in Ilijaš, acquainted with the works on thermal insulation. This school is located in such a geographic position, which makes it virtually impossible to work normally in the past years during the winter.

“One professor who recently retired was surprised to hear that in the school halls one can now walk without a coat” – he conveyed to his guests Impression Director Refik Kurtovic, pointing out that now the savings on heating are enormous.

” We have improvements in all segments. The new boiler allows us a more comfortable approach to the heating process. Before our janitors had to come in midnight to warm up in the morning classrooms. This is not the case now, “Kurtovic added.

 

 

With the resources of the World Bank, the facade has been refurbished, with complete exterior joinery, functionalized boiler room and new radiators.

 

“The most beautiful part of my job is when I can go out to the field and see the results of my work. I am glad to see people dedicated to their work and finally to younger pupils who have better conditions for schooling, “said Jari Vayrynen, the World Bank project leader.

 

DSC_6833(1)

 

The project “Energy Efficiency in Bosnia and Herzegovina” is realized with the help of World Bank loans, with a total value of USD 32 million, of which the Federation of BiH is USD 19.2 million. Within the project in 2016, energy efficiency measures were implemented in 18 public facilities across the Federation of Bosnia and Herzegovina, which significantly improved the comfort of public facilities, as well as the realized savings in energy costs.

Prison Igman

PRISON IGMAN

Address: Branilaca Sarajeva 8, Sarajevo

Heated area: 498 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of new pellet boilers;
  • Automatic regulation for the heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 159,361.27
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 23,860
Total energy savings (thermal and electrical): 129.050,00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary energy source)
Works completed: 03/2018

Public Institution Pazarić Institute – Pavilion 8

PUBLIC INSTITUTION PAZARIĆ INSTITUTE – PAVILION 8

Address: Pazarić Resnik, 71243 Pazarić

Heated area: 1,317 m2


Energy efficiency measures:

 

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 212,276.55
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 10,029
Total energy savings (thermal and electrical): 128,190.00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the renovation, biomass was also used as the primary fuel for heating)
Works completed: 03/2018

Elementary School Gazi Ferhad-Beg Jablanica

ELEMENTARY SCHOOL GAZI FERHAD-BEG JABLANICA

Address: Jablanica bb, Tešanj

Heated area: 1,330 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Repair of the roof and thermal insulation of the attic;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of the new pellet boiler;
  • Installation of heat accumulators;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity

Total investments (BAM with VAT): 284,841.08
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 9,744
Total energy savings (thermal and electrical): 393,362.00 kWh/year
CO2 emissions: 99 tCO2 /year
Works completed: 12/2017

Prison Bihać

PRISON BIHAĆ

Address: Rasima Delića bb 77000 Bihać

Heated area: 1,098 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of a new pellet boiler;
  • Connection of the administrative building to the new boiler room;
  • Installation of external LED reflectors;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 284,128.26
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 45,962
Total energy savings (thermal and electrical): 162.714,00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the energy renovation, the energy source was replaced with biomass)
Works completed: 03/2018

Federal Ministry of Finance

FEDERAL MINISTRY OF FINANCE

Address: Mehmeda Spahe 5, 71000 Sarajevo

Heated area: 3,155 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 465,018.37
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,167
Total energy savings (thermal and electrical): 393,528.00 kWh/year
CO2 emissions: 50 tCO2 /year
Works completed: 07/2018

Police Academy – Building A

POLICE ACADEMY – BUILDING A

Address: Dobojska 32, 71000 Sarajevo

Heated area: 1,260 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 201,463.31
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 13,734
Total energy savings (thermal and electrical): 113,865.00 kWh/year
CO2 emissions: 19 tCO2 /year
Works completed: 03/2018

Elementary school April 15, Kakanj

ELEMENTARY SCHOOL APRIL 15, KAKANJ

Address: 29. Novembar 35, Kakanj

Heated area: 2,120 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Thermal insulation of the part of the attic space;
  • Replacement of facade openings;
  • Rehabilitation of the existing part of the cover – replacement of salonite panels with a steel sheet cover;
  • Installation of radiators in the hall;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption and;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 298,414.64
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,211
Total energy savings (thermal and electrical): 280,237.00 kWh/year
CO2 emissions: 66 tCO2 /year
Works completed: 04/2018

Gymnasium Rizah Odžečkić

GYMNASIUM RIZAH ODŽEČKIĆ

Address: Stjepana Radića 43, Zavidovići

Heated area: 1,467 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade; 
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of motion and daylight sensors;
  • Installation of dynamic thermostatic radiator valves;
  • Replacement of energy source;
  • Installation of equipment for measuring energy consumption and monitoring temperature and humidity;
  • Installation of new pellet boilers;
  • Installation of equipment for measuring energy consumption and;
  • Installation of equipment for monitoring temperature and humidity;

Total investments (BAM with VAT): 327,266.31
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 42,099
Total energy savings (thermal and electrical): 128,098.00 kWh/year
CO2 emissions: 32 tCO2 /year
Works completed: 04/2018

Elementary school March 21

ELEMENTARY SCHOOL MARCH 21

Address: Trg 21. mart 12, Matuzići, Doboj Jug

Heated area: 1,953 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Repair of part of the roof;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of motion sensors;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Installation of the new pellet boiler;

Total investments (BAM with VAT): 141,182.75
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 14,307
Total energy savings (thermal and electrical):  135,151.00 kWh/year
CO2 emissions: 28 tCO2 /year
Works completed: 04/2018