Elementary school “Safvet-beg Bašagić” Visoko

ELEMENTARY SCHOOL “SAFVET-BEG BAŠAGIĆ” VISOKO

Donja Mahala 42, Visoko

Heated area: 2,740 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of part of the existing joinery/metalwork;
  • Partial replacement of lighting fixtures;
  • Improvement of the central heating system;
  • Installation of pellet boilers;
  • Installation of dynamic thermostatic valves;
  • Replacement of asbestos cover;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 469,385.78
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 124,097.65
Total energy savings (thermal and electrical): 307,004 kWh/year
CO2 emissions: 170 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022

Elementary School “1st March” Jelah (Tešanj)

ELEMENTARY SCHOOL “1ST MARCH” JELAH (TEŠANJ)

Husein Kapetana Gradaščevića, Jelah

Heated area: 1,919 m2

Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of existing joinery/metalwork;
  • Partial replacement of lighting fixtures;
  • Improvement of the central heating system;
  • Installation of pellet boilers;
  • Installation of dynamic thermostatic valves;
  • Replacement of asbestos cover;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 553,073.60
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 81,352
Total energy savings (thermal and electrical): 744,153 kWh/year
CO2 emissions: 268 tCO2 /year
Start of works: 21/09/2021
Works completed/Date of technical acceptance: 20/04/2022

Public Institutuion Medical School Zenica

PUBLIC INSTITUTION MEDICAL SCHOOL ZENICA

Address: Crkvenice bb, Zenica

Heated area: 3,447.95 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of a flat roof;
  • Thermal insulation of the ceiling;
  • Partial replacement of lighting fixtures;
  • Installation of dynamic thermostatic valves;
  • Installation of automatic regulation of the heating system;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 617,777.88
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 117,749
Total energy savings (thermal and electrical): 733,698 kWh/year
CO2 emissions: 250 tCO2 /year
Start of works: 27/09/2021
Works completed/Date of technical acceptance: 21/03/2022

Elementary School Vladimir Nazor

ELEMENTARY SCHOOL VLADIMIR NAZOR

Address: Sarajevska 20, Zenica

Heated area: 2,557 m2


Energy efficiency measures:

 
  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling;
  • Installation of dynamic thermostatic radiator valves;
  • Partial replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 642,530.85
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 73,038
Total energy savings (thermal and electrical): 457,150.00 kWh/year
CO2 emissions: 158 tCO2 /year
Works completed: 05/2019

Public Institution Gymnasium Visoko

PUBLIC INSTITUTION GYMNASIUM, VISOKO

Address: Musala 23, 71 300 Visoko

Heated area: 1,858 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Thermal insulation of ceilings;
  • Renovation of the flat roof;

Total investments (BAM with VAT): 126,144.05
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 9,936
Total energy savings (thermal and electrical): 18.076,00 kWh/year
CO2 emissions: 25 tCO2 /year
Works completed: 05/2019

Public Institution Second Elementary School Zavidovići

PUBLIC INSTITUTION SECOND ELEMENTARY SCHOOL ZAVIDOVIĆI

Address: 8.Mart, 72 220 Zavidovići

Heated area: 2,726 m2


Energy efficiency measures:

 

  • Thermal insulation of the ceiling;
  • Installation of new pellet boilers;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of dynamic thermostatic radiator valves;

Total investments (BAM with VAT): 284,254.08
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 31,710
Total energy savings (thermal and electrical): 53,954.00  kWh/year
CO2 emissions: 86 tCO2 /year
Works completed: 05/2019

Combined Secondary School Stjepan Radić, Usora

COMBINED SECONDARY SCHOOL STJEPAN RADIĆ, USORA

Address: Žabljak bb, Usora

Heated area: 2,162 m2


Energy efficiency measures:

 

  • Replacement of boiler plant;
  • Replacement of the part of the pipeline distribution system and radiator bodies (331 articles);
  • Installation of daylight and movement sensors on the lighting system;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 82,712.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 14,532
Total energy savings (thermal and electrical): 20,596.00 kWh/year
CO2 emissions: 34 tCO2 /year
Works completed: 05/2019

Public Institution Secondary School Gymnasium Muhsin Rizvić

PUBLIC INSTITUTION SECONDARY SCHOOL GYMNASIUM MUHSIN RIZVIC

Address: Ulica šehida 32, 72 240 Kakanj

Heated area: 2,240 m2


Heated area: 2,240 m2

 

  • Thermal insulation of the ceiling;
  • Replacement of facade openings;
  • Partial thermal insulation of the facade and production of the final facade layer;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 143,885.87
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 32,190
Total energy savings (thermal and electrical): 104,920.14 kWh/year
CO2 emissions: 27 tCO2 /year
Works completed: 05/2019

Elementary School Vareš Majdan

ELEMENTARY SCHOOL VAREŠ MAJDAN

Address: Perunska 24, 71330 Vareš

Heated area: 3,049 m2


Energy efficiency measures:

 

 

  • Thermal insulation of the facade (school + sports hall);
  • Replacement of facade openings (school + sports hall);
  • Thermal insulation of the ceiling towards the attic (school);
  • Rehabilitation and thermal insulation of the pitched roof of the changing rooms and sports hall;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Renovation of the roof of the school and the gymnasium;
  • Replacement of worn-out asbestos cement roof panels panels with the new cover made of a steel sheet and thermopanel;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 533,970.47
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 26,523
Total energy savings (thermal and electrical): 416.712,00 kWh/year
CO2 emissions: 23 tCO2 /year
Works completed: 04/2018

Elementary School Gazi Ferhad-Beg Jablanica

ELEMENTARY SCHOOL GAZI FERHAD-BEG JABLANICA

Address: Jablanica bb, Tešanj

Heated area: 1,330 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Repair of the roof and thermal insulation of the attic;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of the new pellet boiler;
  • Installation of heat accumulators;
  • Installation of equipment for measuring energy consumption;
  • Installation of equipment for monitoring temperature and humidity

Total investments (BAM with VAT): 284,841.08
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 9,744
Total energy savings (thermal and electrical): 393,362.00 kWh/year
CO2 emissions: 99 tCO2 /year
Works completed: 12/2017