Federal Institute for Agriculture

FEDERAL INSTITUTE FOR AGRICULTURE

Address: Butimirska cesta 40, Sarajevo

Heated area: 2,789 m2


Energy efficiency measures:

  • Thermal insulation of the facade;
  • Replacement of windows and doors;
  • Installation of TRVs; 
  • Boiler replacement; 
  • Improvement of the thermotechnical system – replacement of boilers;
  • Partial replacement of lighting fixtures


Total investments (BAM with VAT): 793,017.27

Total energy savings (thermal and electrical): 191,208 kWh/year

CO2 emissions: 13,5 tCO2/year

Public Institution for the Care of Mentally Disabled Children and Youth, Pazarić

PUBLIC INSTITUTION FOR THE CARE OF MENTALLY DISABLED CHILDREN AND YOUTH, PAZARIĆ


Address: Resnik b.b. Pazarić


Heated area: 358 m2


Energy efficiency measures:

  • Thermal insulation of facade walls,
  • Thermal insulation of the roof towards the attic;
  • Installation of thermostatic valves;
  • Partial replacement of lighting fixtures.


Total investments (BAM with VAT): 210,013.30

Total energy savings (thermal and electrical): 345.637 kWh/year

CO2 emissions: 320 tCO2/year

Start of works: 27/10/2022
Works completed/Date of technical acceptance: 18/01/2023

Building of judicial institutions FBIH, Sarajevo

BUILDING OF JUDICIAL INSTITUTIONS FBIH, SARAJEVO


Address: Valtera Perića 15, Sarajevo


Heated area: 5,725 m2


Energy efficiency measures:

  • Thermal insulation of facade walls,
  • Roof thermal insulation, with roof replacement;
  • Partial replacement of existing carpentry / locksmith
  • Installation of a central space cooling system, with the installation of a new pipe network and the installation of a fan convector;
  • Replacement of existing boilers with more energy efficient ones,
  • Partial replacement of lighting fixtures.

Total investments (BAM with VAT): 2,141,476.80 BAM

Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 68,600

Total energy savings (thermal and electrical): 613,538 kWh/year

CO2 emissions: 270 tCO2/year
Start of works: 31/01/2023
Works completed/Date of technical acceptance: 10/10/2023

Clinic for physical medicine and rehabilitation, Sarajevo

CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION SARAJEVO

Address: Bolnička 25, Sarajevo

Heated area: 1,907.53 m2


Energy efficiency measures:

  • Thermal insulation of the external walls;
  • Windows and doors replacement;
  • Thermal insulation of the ceiling below the pitched roof;
  • Thermal insulation of the floor abave unheated;
  • Installation of thermostatic valves;
  • Heat Meter Installation
  • Temperature and Humidity Sensor Installation
  • Remote data reading system instalation

Total investments (BAM with VAT): 792,640,19
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 60.634,57
Total energy savings (thermal and electrical): 430,487 kWh/year
CO2 emissions: 87,0 tCO2/year
Start of works: 03/02/2022
Works completed/Date of technical acceptance: 12/10/2022

Urgent Medicine Clinic Sarajevo

URGENT MEDICINE CLINIC SARAJEVO

Address: Bolnička 25, Sarajevo

Heated area: 8,481,89 m2


Energy efficiency measures:

  • Thermal insulation of the external walls;
  • Windows and doors replacement;
  • Thermal insulation of the flat roof;
  • Installation of thermostatic valves;
  • Heat Pumps Installation
  • Heat Meter Installation
  • Temperature and Humidity Sensor Installation
  • Remote data reading system instalation

Total investments (BAM with VAT): 2,382,029.15
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 192,918.9
Total energy savings (thermal and electrical):1,369,670.00 kWh/yr
CO2 emissions: 275,0 tCO2/yr
Start of works: 03/02/2022
Works completed/Date of technical acceptance: 29/11/2022

Sarajevo Police Academy

SARAJEVO POLICE ACADEMY

Address: Dobojska 32, Sarajevo

Heated area: 9,959.56 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Replacement of existing joinery/metalwork;
  • Thermal insulation of the roof:
  • Thermal insulation of the ceiling towards the unheated attic;
  • Installation of dynamic thermostatic valves;
  • Partial replacement of lighting fixtures;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 944,207.97
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 228,835.67
Total energy savings (thermal and electrical):  2,214.841 kWh/year
CO2 emissions: 425 tCO2 /year
Start of works: 16/08/2021
Works completed/Date of technical acceptance: 24/06/2022

Clinic for Pulmonary Diseases Sarajevo

CLINIC FOR PULMONARY DISEASES SARAJEVO

Address: Bardakčije 90, Sarajevo

Heated area: 3,796 m2


Energy efficiency measures:

  • Thermal insulation of the external walls;
  • Thermal insulation of the ceiling below the pitched roof;
  • Windows and doors replacement;
  • Partial replacement of the Lighting Fixtures
  • Heat Meter Installation
  • Temperature and Humidity Sensor Installation
  • Remote data reading system instalation

Total investments (BAM with VAT): 474,796.45
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 36,341,3
Total energy savings (thermal and electrical): 333,209 kWh/year
CO2 emissions: 78,4 tCO2/year
Start of works: 27/01/2022
Works completed/Date of technical acceptance: 08/09/2022

Public Institution Secondary School for Environment and wood design

PUBLIC INSTITUTION SECONDARY SCHOOL FOR ENVIRONMENT AND WOOD DESIGN

Address: Vilsonovo šetalište 11, Sarajevo

Heated area: 2,639.39 m2


Energy efficiency measures:

 
  • Thermal insulation of external walls;
  • Rehabilitation of the existing roof of the school building and sports hall, with the installation of thermal insulation;
  • Opening replacement;
  • Replacement of equipment and improvement of the space heating system;
  • Replacement of lighting fixtures with more energy efficient ones

Total investments (BAM with VAT): 626,860.93
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 56,302.74
Total energy savings (thermal and electrical): 510.597,00 kWh/year
CO2 emissions: 136 tCO2 /year
Works completed: 09/2020

Public Institution Secondary School of Electrical Engineering, Sarajevo

PUBLIC INSTITUTION SECONDARY SCHOOL OF ELECTRICAL ENGINEERING, SARAJEVO

Address: Safeta Zajke 2, 71 000 Sarajevo

Heated area: 4,495 m2


Energy efficiency measures:

 
  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Installation of new gas boilers;
  • Rehabilitation of the boiler room;

Total investments (BAM with VAT): 547,953.48
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 35,254
Total energy savings (thermal and electrical): 327,137.00 kWh/year
CO2 emissions: 91 tCO2 /year
Works completed: 07/2019

Public Institution Fifth Elementary School, Ilidža

PUBLIC INSTITUTION FIFTH ELEMENTARY SCHOOL, ILIDŽA

Address: Umihane Čuvidine 58, Sokolovići – Ilidža

Heated area: 2,887 m2


Energy efficiency measures:

 
  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Partial replacement of lighting fixtures with more energy efficient ones;
  • Installation of new gas boilers;
  • Installation of dynamic thermostatic radiator valves

Total investments (BAM with VAT): 372,313.42
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 18,636
Total energy savings (thermal and electrical):  246,930.00 kWh/year
CO2 emissions: 187 tCO2 /year
Works completed: 07/2019