JZU UKC TUZLA – Clinic for internal diseases

JZU UKC TUZLA – Clinic for internal diseases

Address: Trnovac bb

Heated area: 9.716,96 m2


Energy efficiency measures:

  • Thermal insulation of facade walls
  • Replacement of existing carpentry
  • Partial replacement of lighting fixtures


Total investments (BAM with VAT): 1.635.111,65

Total energy savings (thermal and electrical): kWh/year

JZU UKC TUZLA – Clinic for internal diseasesCO2 emissions:  tCO2/year

Start of works: 21/11/2023

Diagnostic annex SKB Mostar – JZU SKB Mostar

Diagnostic annex SKB Mostar – JZU SKB Mostar

Address: Bijeli brijeg bb, Mostar

Heated area: 3.061 m2


Energy efficiency measures:

  • Thermal insulation of facade walls
  • Replacement of existing carpentry/locksmith;
  • Improvement of the thermomechanical system,
  • Partial replacement of lighting fixtures.


Total investments (BAM with VAT): 581.709,00

Total energy savings (thermal and electrical): 133.035,00 kWh/year

CO2 emissions: 60 tCO2/year

Start of works: 10/10/2023

JU Center for Culture “National University Konjic”

JU Center for Culture “National University Konjic”

Address: Varda bb, Konjic

Heated area: 3,578 m2


Energy efficiency measures:

  • Painting of metal fences, posts and masts;Replacement of windows and doors;
  • Part of facade works; 
  • Works on the summer scene;


Total investments (BAM with VAT): 80,007.53

Total energy savings (thermal and electrical): 502.729 kWh/yr

CO2 emissions: 312 tCO2/yr

Federal Institute for Agriculture

FEDERAL INSTITUTE FOR AGRICULTURE

Address: Butimirska cesta 40, Sarajevo

Heated area: 2,789 m2


Energy efficiency measures:

  • Thermal insulation of the facade;
  • Replacement of windows and doors;
  • Installation of TRVs; 
  • Boiler replacement; 
  • Improvement of the thermotechnical system – replacement of boilers;
  • Partial replacement of lighting fixtures


Total investments (BAM with VAT): 793,017.27

Total energy savings (thermal and electrical): 191,208 kWh/year

CO2 emissions: 13,5 tCO2/year

Public Institution for the Care of Mentally Disabled Children and Youth, Pazarić

PUBLIC INSTITUTION FOR THE CARE OF MENTALLY DISABLED CHILDREN AND YOUTH, PAZARIĆ


Address: Resnik b.b. Pazarić


Heated area: 358 m2


Energy efficiency measures:

  • Thermal insulation of facade walls,
  • Thermal insulation of the roof towards the attic;
  • Installation of thermostatic valves;
  • Partial replacement of lighting fixtures.


Total investments (BAM with VAT): 210,013.30

Total energy savings (thermal and electrical): 345.637 kWh/year

CO2 emissions: 320 tCO2/year

Start of works: 27/10/2022
Works completed/Date of technical acceptance: 18/01/2023

Federation Government Building, Mostar

FEDERATION GOVERNMENT BUILDING, MOSTAR


Address: Ante Starčevića bb, Mostar


Heated area: 4,351 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation and reconstruction of a flat roof;
  • Replacement of existing hardware;
  • More advanced thermotechnical system-installation of heat pump;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 1,075,698.00

Total energy savings (thermal and electrical): 142,275 kWh/year
CO2 emissions: 34 tCO2/year

Mixed Industrial High School Zenica

MIXED INDUSTRIAL HIGH SCHOOL ZENICA


Address: Bulevar Kralja Tvrtka I, Zenica


Heated area: 3,514 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Roof thermal insulation;
  • Replacement of existing carpentry / locksmith;
  • Installation of thermostatic valves;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 783,619

Total energy savings (thermal and electrical): 541,150 kWh/year
CO2 emissions: 158,6 tCO2/year
Start of works: 20/10/2022
Works completed/Date of technical acceptance: 24/03/2023

County / Cantonal Court In Mostar

COUNTY / CANTONAL COURT IN MOSTAR


Address: Ante Starčevića 22, Mostar


Heated area: 2,005 m2


Energy efficiency measures:

  • Thermal insulation of facade walls, ceiling and roof;
  • Replacement of existing carpentry;
  • Improving the central heating system;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 912,155.51

Total energy savings (thermal and electrical): 602.093 kWh/year
CO2 emissions: 2,1 tCO2/year
Start of works: 10/11/2022
Works completed/Date of technical acceptance: 10/03/2023

“Mehmedalija Mak Dizdar” High School i “Mushin Rizvić” Gymnasium, Breza

“MEHMEDALIJA MAK DIZDAR” HIGH SCHOOL   I “MUSHIN RIZVIĆ” GYMNASIUM, BREZA


Address: Šehidska 34,  Breza


Heated area: 3,328 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of existing carpentry / locksmith;
  • Installation of thermostatic valves;
  • Boiler and energy source replacement;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 821,871.41 BAM

Total energy savings (thermal and electrical): 877,218 kWh/year
CO2 emissions: 79,5 tCO2/year

Start of works: 20/10/2022
Works completed/Date of technical acceptance: 24/03/2023