Navigation

Elementary school Silvije Strahimir Kranjčević

About project

ELEMENTARY SCHOOL SILVIJE STRAHIMIR KRANJČEVIĆ

Address: Bleiburških žrtava 35, Mostar

Area: 6,400 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade (school + sports hall);
  • Replacement of facade openings (school + sports hall);
  • Thermal insulation of flat and sloping roofs;
  • Replacement of the existing cover of the sports hall with thermal panels;
  • Replacement of energy source;
  • Installation of the new pellet boiler;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;
  • Rehabilitation of the boiler room;

Total investments (BAM with VAT): 1,092,522.77 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 122,936 
Total energy savings (thermal and electrical): 181,666.00 kWh/year
CO2 emissions: 163 tCO2 /year
Works completed: 7/2018

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano