ELEMENTARY SCHOOL SILVIJE STRAHIMIR KRANJČEVIĆ
Address: Bleiburških žrtava 35, Mostar
Area: 6,400 m2
Energy efficiency measures:
- Thermal insulation of the facade (school + sports hall);
- Replacement of facade openings (school + sports hall);
- Thermal insulation of flat and sloping roofs;
- Replacement of the existing cover of the sports hall with thermal panels;
- Replacement of energy source;
- Installation of the new pellet boiler;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
- Rehabilitation of the boiler room;
Total investments (BAM with VAT): 1,092,522.77
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 122,936
Total energy savings (thermal and electrical): 181,666.00 kWh/year
CO2 emissions: 163 tCO2 /year
Works completed: 7/2018