About project
CLINIC FOR PHYSICAL MEDICINE AND REHABILITATION SARAJEVO
Address: Bolnička 25, Sarajevo
Heated area: 1,907.53 m2
Energy efficiency measures:
- Thermal insulation of the external walls;
- Windows and doors replacement;
- Thermal insulation of the ceiling below the pitched roof;
- Thermal insulation of the floor abave unheated;
- Installation of thermostatic valves;
- Heat Meter Installation
- Temperature and Humidity Sensor Installation
- Remote data reading system instalation
Total investments (BAM with VAT): 792,640,19
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 60.634,57
Total energy savings (thermal and electrical): 430,487 kWh/year
CO2 emissions: 87,0 tCO2/year
Start of works: 03/02/2022
Works completed/Date of technical acceptance: 12/10/2022