Public Institution Sixth Elementary School Mostar

About project

PUBLIC INSTITUTION SIXTH ELEMENTARY SCHOOL MOSTAR

Address: Alekse Šantića 10, 88 000 Mostar

Heated area: 2,269 m2


Energy efficiency measures:

 

  • Partial replacement of existing joinery
  • Thermal insulation of façade
  • Thermal insulation of ceiling construction and flat roofs
  • Replacement of the sports hall cover
  • Installation of thermostatic valves
  • Replacement of boiler and energy source

Total investments (BAM with VAT): 375,247.28 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 39,485 
Total energy savings (thermal and electrical): 110,354.00 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 5/2019

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano