About project
CLINICAL CENTRE OF THE UNIVERSITY OF SARAJEVO – CLINIC FOR ORTHOPEDICS AND TRAUMATOLOGY
Address: Bolnička 25, Sarajevo
Heated area: 7,382 m2
Energy efficiency measures:
- Thermal insulation of the facade;
- Replacement of facade openings;
- Installation of dynamic thermostatic radiator valves;
- Installation of equipment for measuring energy consumption;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 1,257.394,21
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 110,075
Total energy savings (thermal and electrical): 781,669.00 kWh/year
CO2 emissions: 167 tCO2 /year
Works completed: 07/2016