SECONDARY SCHOOL JABLANICA
Address: Zlatnih ljiljana br.4, Jablanica
Area: 2,011 m2
Energy efficiency measures:
- Thermal insulation of facade;
- Replacement of facade openings;
- Thermal insulation of the ceiling towards the attic;
- Renovation of the roof structure and replacement of the roof covering;
- Partial replacement of lighting fixtures with more energy efficient; ones;
- Replacement of energy source;
- Installation of the new pellet boiler;
- Adaptation of the existing boiler room for new needs;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
- Improvement of the central heating system;
Total investments (BAM with VAT): 488,456.20
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 24,379
Total energy savings (thermal and electrical): 118,955.00 kWh/year
CO2 emissions: 50 tCO2/year
Works completed: 7/2018