ELEMENTARY SCHOOL SAFVET-BEG BAŠAGIĆ BREZA

Address: Breza

Heated area: 2,260 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the ceiling;
  • Replacement of existing joinery/metalwork;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 496,273.14
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 19,880.13
Total energy savings (thermal and electrical): 71.729 kWh/year
CO2 emissions: 20 tCO2 /year
Start of works: 5/10/2021
Works completed/Date of technical acceptance: 2/8/2022

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano