Public Institution Second Elementary School Zavidovići

About project

PUBLIC INSTITUTION SECOND ELEMENTARY SCHOOL ZAVIDOVIĆI

Address: 8.Mart, 72 220 Zavidovići

Heated area: 2,726 m2


Energy efficiency measures:

 

  • Thermal insulation of the ceiling;
  • Installation of new pellet boilers;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of dynamic thermostatic radiator valves;

Total investments (BAM with VAT): 284,254.08
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 31,710
Total energy savings (thermal and electrical): 53,954.00  kWh/year
CO2 emissions: 86 tCO2 /year
Works completed: 05/2019

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano