Navigation

Elementary School Vladimir Nazor

About project

ELEMENTARY SCHOOL VLADIMIR NAZOR

Address: Sarajevska 20, Zenica

Heated area: 2,557 m2


Energy efficiency measures:

 
  • Replacement of facade openings;
  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling;
  • Installation of dynamic thermostatic radiator valves;
  • Partial replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 642,530.85
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 73,038
Total energy savings (thermal and electrical): 457,150.00 kWh/year
CO2 emissions: 158 tCO2 /year
Works completed: 05/2019

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano