Public Institution Elementary School Izet Šabić, Vogošća

About project

PUBLIC INSTITUTION ELEMENTARY SCHOOL IZET SABIC, VOGOSCA

Address: Donji Hotonj, bb 71 320 Vogošća

Heated area: 2,531 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of circulation pumps;
  • Replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 338,799.66
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 48,206
Total energy savings (thermal and electrical): 241,158.00  kWh/year
CO2 emissions: 105 tCO2 /year
Works completed: 07/2019

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano