Navigation

Public Institution Drežnica, Elementary School

About project

PUBLIC INSTITUTION DREŽNICA ELEMENTARY SCHOOL

Address: Donja Drežnica bb, Mostar

Heated area: 1,768 m2


Energy efficiency measures:

 
  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Renovation of part of the roof covering with all necessary layers;
  • Installation of thermostatic valves on radiators;
  • Rehabilitation of the radiator heating of the sports hall;
  • Partial replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 440,403.75 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 6,698
Total energy savings (thermal and electrical):141.840,00 kWh/year
CO2 emissions: 2 tCO2 /year
Works completed: 6/2018

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano