PUBLIC INSTITUTION SECONDARY SCHOOL PROZOR-RAMA
Kralja Tomislava bb, Prozor-Rama
Heated area: 1,905 m2
Energy efficiency measures:
- Thermal insulation of external walls;
- Renovation of the roof structure, replacement of the roof covering and thermal insulation of the ceiling above the heated space;
- Improvement of the heating system;
- Partial replacement of facade openings;
Total investments (BAM with VAT): 200.739.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 38,038.00
Total energy savings (thermal and electrical): 101,855.00 kWh/year
CO2 emissions: 57 tCO2 /year
Works completed: 10/2020