PUBLIC INSTITUTION SECONDARY SCHOOL PROZOR-RAMA

Kralja Tomislava bb, Prozor-Rama

Heated area: 1,905 m2

Energy efficiency measures:

  • Thermal insulation of external walls;
  • Renovation of the roof structure, replacement of the roof covering and thermal insulation of the ceiling above the heated space;
  • Improvement of the heating system;
  • Partial replacement of facade openings;

Total investments (BAM with VAT): 200.739.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 38,038.00
Total energy savings (thermal and electrical): 101,855.00 kWh/year
CO2 emissions: 57 tCO2 /year
Works completed: 10/2020

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano