The implementation of the works will improve the patient’s living conditions as well as the quality of the work of this institution.
The KCUS Neuroscience Clinic is one of 14 public buildings on which this year, within the framework of the World Bank’s Energy Efficiency Project (BEEP), energy efficiency measures will be implemented, for which a contract was signed between Josip Martic, Federal Minister of Physical Planning and representatives of company ITC doo Zenica.

In the reconstruction of the facility will be invested about 1.240.000,00 KM with VAT, and the planned work will be realized in accordance with world standards in the field of energy efficiency. Concerning specific measures at the clinic will be, among other, implemented measures such as replacement of the orifice installation of thermal insulation and improvement of heating system.

During contact signing, Minister Martic expressed satisfaction with the fact that the implementation of the works will improve the conditions of patient stay at the clinic, as well as the quality of these institutions employees work, and added: ” Energy efficiency measures implemented will reduce the need for energy, which will ultimately result in lower maintenance costs and higher financial savings.”

After the realization of the project, significant savings are expected on energy costs as well as CO2 emissions.