About project
CLINIC FOR NEUROLOGY AND PSYCHIATRY, CLINICAL CENTRE OF THE UNIVERSITY OF SARAJEVO
Adress: Bolnička 25, 71000 Sarajevo
Heated area: 5,704 m2
Energy efficiency measures:
- Thermal insulation of the facade;
- Replacement of facade openings;
- Thermal insulation of the ceiling towards the attic;
- Thermal insulation of the mezzanine structures above the unheated basement;
- Renovation of part of the roof covering and flat roof terraces in the central part of the building;
- Installation of dynamic thermostatic radiator valves;
- Installation of circulation pumps;
- Partial replacement of lighting fixtures with more energy efficient ones;
- Installation of equipment for measuring energy consumption;
- Installation of equipment for monitoring temperature and humidity;
- Improvement of the central heating system
Total investments (BAM): 1,163,028.18
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 183,164
Total energy savings (thermal and electrical): 781,669.00 kWh/year
CO2 emissions: 226 tCO2 /year
Works completed: 06/2018