Secondary School Čapljina

About project

Secondary School Čapljina

Address: Ruđera Boškovića 9, Čapljina

Heated area: 4,770 m2


Energy efficiency measures:

  • Thermal insulation of the facade;
  • Reconstruction of the roof and thermal insulation of the ceiling;
  • Replacement of facade openings;
  • Installation of the new pellet boiler;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 996,062.76 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM):  166,231
Total energy savings (thermal and electrical): 705,600.00 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 12/2016

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano