About project
Secondary School Čapljina
Address: Ruđera Boškovića 9, Čapljina
Heated area: 4,770 m2
Energy efficiency measures:
- Thermal insulation of the facade;
- Reconstruction of the roof and thermal insulation of the ceiling;
- Replacement of facade openings;
- Installation of the new pellet boiler;
- Installation of dynamic thermostatic radiator valves;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 996,062.76
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 166,231
Total energy savings (thermal and electrical): 705,600.00 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 12/2016