SECONDARY TRANSPORTATION SCHOOL/SECONDARY SCHOOL OF MECHANICAL ENGINEERING AND TRANSPORTATION

Address: Dr. Mile Budaka br.26, Mostar

Heated area: 2,900 m2


Energy efficiency measures:

 

  • Replacement of facade openings;
  • Thermal insulation of external walls;
  • Thermal insulation of the ceiling above the heated space;
  • Installation of the new pellet boiler;
  • Replacement of energy source;
  • Partial replacement of lighting fixtures with more energy efficient ones;

Total investments (BAM with VAT): 403,202.32 
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 60,386
Total energy savings (thermal and electrical): 284,898 kWh/year
CO2 emissions: 121 tCO2 /year
Works completed: 10/2020

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano