Prison Bihać

About project

PRISON BIHAĆ

Address: Rasima Delića bb 77000 Bihać

Heated area: 1,098 m2


Energy efficiency measures:

 

  • Thermal insulation of the facade;
  • Replacement of facade openings;
  • Thermal insulation of the ceiling towards the attic;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of a new pellet boiler;
  • Connection of the administrative building to the new boiler room;
  • Installation of external LED reflectors;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;

Total investments (BAM with VAT): 284,128.26
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 45,962
Total energy savings (thermal and electrical): 162.714,00 kWh/year
CO2 emissions: 0 tCO2 /year
(before the energy renovation, the energy source was replaced with biomass)
Works completed: 03/2018

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano