About project
ELEMENTARY SCHOOL “1ST MARCH” JELAH (TEŠANJ)
Husein Kapetana Gradaščevića, Jelah
Heated area: 1,919 m2
Energy efficiency measures:
- Thermal insulation of facade walls;
- Thermal insulation of the ceiling;
- Replacement of existing joinery/metalwork;
- Partial replacement of lighting fixtures;
- Improvement of the central heating system;
- Installation of pellet boilers;
- Installation of dynamic thermostatic valves;
- Replacement of asbestos cover;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 553,073.60
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 81,352
Total energy savings (thermal and electrical): 744,153 kWh/year
CO2 emissions: 268 tCO2 /year
Start of works: 21/09/2021
Works completed/Date of technical acceptance: 20/04/2022
PITANJA
Uspješno poslano
KOMENTARI