PUBLIC INSTITUTION ELEMENTARY SCHOOL MUSA CAZIM CATIC
Address: Školska 23, Zenica
Heated area: 3,423 m2
Energy efficiency measures:
- Thermal insulation of the facade;
- Replacement of facade openings;
- Installation of dynamic thermostatic radiator valves;
- Improvement of the central heating system;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 455,782.28
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 49,213
Total energy savings (thermal and electrical): 363,661.00 kWh/year
CO2 emissions: 100 tCO2 /year
Works completed: 11/2016