“Mehmedalija Mak Dizdar” High School i “Mushin Rizvić” Gymnasium, Breza

About project

“MEHMEDALIJA MAK DIZDAR” HIGH SCHOOL   I “MUSHIN RIZVIĆ” GYMNASIUM, BREZA


Address: Šehidska 34,  Breza


Heated area: 3,328 m2


Energy efficiency measures:

  • Thermal insulation of facade walls;
  • Thermal insulation of the roof;
  • Replacement of existing carpentry / locksmith;
  • Installation of thermostatic valves;
  • Boiler and energy source replacement;
  • Partial replacement of lighting fixtures;

Total investments (BAM with VAT): 821,871.41 BAM

Total energy savings (thermal and electrical): 877,218 kWh/year
CO2 emissions: 79,5 tCO2/year

Start of works: 20/10/2022
Works completed/Date of technical acceptance: 24/03/2023

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano