Heated area: 1,800 m2
Energy efficiency measures:
- Thermal insulation of the facade;
- Thermal insulation of the ceiling above the unheated basement;
- Rehabilitation and thermal insulation of the flat roof Replacement of facade openings;
- Installation of dynamic thermostatic radiator valves;
- Installation of the new pellet boilers;
- Replacement of lighting fixtures with more energy efficient ones;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 565,845.87
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 63,371
Total energy savings (thermal and electrical): 152,135 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 12/2016