Secondary School of Civil Engineering Juraj Dalmatinac

About project

SECONDARY SCHOOL OF CIVIL ENGINEERING JURAJ DALMATINAC

Address: Kralja Zvonimira 24, Mostar

Heated area: 1,800 m2


Energy efficiency measures:


  • Thermal insulation of the facade;
  • Thermal insulation of the ceiling above the unheated basement;
  • Rehabilitation and thermal insulation of the flat roof Replacement of facade openings;
  • Installation of dynamic thermostatic radiator valves;
  • Installation of the new pellet boilers;
  • Replacement of lighting fixtures with more energy efficient ones;
  • Installation of equipment for measuring energy consumption;
  • Installation of temperature and humidity monitoring equipment;


Total investments (BAM with VAT): 565,845.87
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 63,371
Total energy savings (thermal and electrical): 152,135 kWh/year
CO2 emissions: 62 tCO2 /year
Works completed: 12/2016

 

Pictures before works
Pictures during works
Pictures after works

KOMENTARI

PITANJA

Select a topic that best fits your question.
Question in one sentence
An account for you will be created and a confirmation link will be sent to you with the password.

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net

Nema više pitanja po Vašoj pretrazi ili nemate dozvole za čitanje istih.

Question and answer is powered by anspress.net
Uspješno poslano