About project
PUBLIC INSTITUTION COMBINED SECONDARY SCHOOL ZENICA
Address: Dr. Adolfa Goldberga 10, Zenica
Heated area: 3,967.32 m2
Energy efficiency measures:
- Thermal insulation of facade walls;
- Thermal insulation of the roof;
- Replacement of existing joinery/metalwork;
- Improvement of the central heating system;
- Installation of dynamic thermostatic valves;
- Partial replacement of lighting fixtures;
- Installation of 12 solar panels;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
Total investments (BAM with VAT): 801,265.92
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 108,885.78
Total energy savings (thermal and electrical): 671,915 kWh/year
CO2 emissions: 165 tCO2 /year
Start of works: 27/09/2021
Works completed/Date of technical acceptance: 21/03/2022