About project
PUBLIC INSTITUTION ELEMENTARY SCHOOL IVAN GUNDULIĆ MOSTAR
Address: Rudarska 87, 88 000 Mostar
Heated area: 1,980 m2
Energy efficiency measures:
- Replacement of facade openings;
- Thermal insulation of the facade;
- Thermal insulation of the flat roof;
- Installation of the new pellet boiler;
- Installation of dynamic thermostatic radiator valves;
- Replacement of circulation pumps;
Total investments (BAM with VAT): 466,830
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 34,941
Total energy savings (thermal and electrical): 125,994.00 kWh/year
CO2 emissions: 66 tCO2 /year
Works completed: 5/2019