About project
ELEMENTARY SCHOOL MARCH 21
Address: Trg 21. mart 12, Matuzići, Doboj Jug
Heated area: 1,953 m2
Energy efficiency measures:
- Thermal insulation of the facade;
- Replacement of facade openings;
- Thermal insulation of the ceiling towards the attic;
- Repair of part of the roof;
- Replacement of lighting fixtures with more energy efficient ones;
- Installation of motion sensors;
- Installation of dynamic thermostatic radiator valves;
- Installation of equipment for measuring energy consumption;
- Installation of temperature and humidity monitoring equipment;
- Installation of the new pellet boiler;
Total investments (BAM with VAT): 141,182.75
Estimated savings on energy costs after the realization of the sub-project, on an annual basis – calculated (BAM): 14,307
Total energy savings (thermal and electrical): 135,151.00 kWh/year
CO2 emissions: 28 tCO2 /year
Works completed: 04/2018